My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
04-18-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 11:10:18 AM
Creation date
8/25/2016 10:50:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� PC Exhibit H <br /> Melanie Curtis <br /> From: Roger Peitso <br /> Sent: Thursday,April 14,2016 3:29 PM <br /> To: Melanie Curtis <br /> �c: Christine Mattson;leremy Bamhart <br /> Subject: 710 Big Island revised <br /> Melanie, <br /> I have done a preliminary review of the proposed project for 71p Big Island and these are my concerns and comments. <br /> 1. I have no records of monitoring or maintenance reports for the septic system since being instalted in 2008.This <br /> is a Type 4 systems so part o#the ongoing compliance of this system is the required annual <br /> maintenance, testing and reporting.This system is non-compliant without the required maintenance and <br /> testing.To resume compliance for this system all maintenance must be completed and testing shall pass <br /> established criteria. Any mitigation that may be required based on testing must be completed per the Mftigation <br /> Plan as previously approved. Due to the fact that the system cannot be tested until August after a normally high <br /> usage period I would recommend that no escrow money's be returned until verification that the system is code <br /> compliant has been completed. <br /> 2. The system is designed for a 3 bedroom so unless there is a system expansian there can be no more than 3 <br /> bedrooms in total for all levels of the structure. <br /> 3. All alterations to the structure and systems are required to meet the current codes and all applicable permits <br /> shall submitted for approvat. <br /> City of Orono <br /> Roger Peitso <br /> Building Official <br /> City of Orono <br /> Phone: 952-249-4600 <br /> Direct: 952-249-4625 <br /> Email: rqeitso@ci.orono.mn.us <br /> Fax:952-249-4616 <br /> �"'��?.�.'��,�` <br /> , , <br /> _ , <br /> .j <br /> -,'�� ; � .� <br /> r y��, <br /> ��1 ��� // <br /> ��'��4'��", .. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.