Preliz�ninary Plat Application 16-3822 <br /> Eisinger Meadows <br /> Page 3 <br /> 5.0 EROSION AND SEDIlVIENT CONTROL PLAN: <br /> 5.1 General SWPPP Notes should be revised to indicate a mini�num 6"topsoil used for re-spread. <br /> 5.2 Nates should be revised to indicate perimeter erosion control measures and protection fencing will <br /> be installed by Contractor and inspected by City prior to any demolition or land disturbance. <br /> Contractor must provide 24 hour notice prior to inspection. <br /> S.3 If the proposed permanent stormwater management basin will be used as a temporary sediment <br /> basin during construction, additional sequencing notes and linework should be included as <br /> necessary to provide clear direction for installarion schedule of perimeter sediment controI devices, <br /> temporary sediment basin,rough grading and temporary ditching,temporary seeding,utility and <br /> street canstruction, site stabilization{including topsoil re-spread,erosion control blanket,riprap, <br /> and permanent vegetation),reznoval of perimeter measures,construction sediment remaval, outlet <br /> control structure installation, and permanent stabilization of the pands. <br /> 5.4 Double siltfence must be provided adjacent to wetlands where grading is proposed within 50' of <br /> the wetland. <br /> 6.0 SANFTARY SEWER AND WATER MAIN PLAN <br /> 6.1 Sanitary sewer and watermain review comments will be provided separately as plan development <br /> progresses. <br /> 7A STORM SEWER PLAN <br /> 7.1 Subsurface draintile service connections should be provided for all lots not directly abutting a pond <br /> or wetland. Storm sewer layout and Drainage and Utility Easements may need to be adjusted <br /> accordingly. <br /> 7.2 CBMH-1 should be constructed with x 4' sump to provide pretreamient prior to the pond/filtration <br /> basin. <br /> 7.3 Cleanouts for the filtration basin nnderdrain should be provided. Cleanouts should be located above <br /> the lugh water level to limit potential for bypassing filtration system. <br /> 8.0 LA,I�,�SCAPE PLAN <br /> 8.1 Since common buckthom is identified in the Conservation Design Master Plan(CDMP)for removal, <br /> the Final Landscape Plan should indicate areas of buckthom removal and incorpotate removal <br /> guidelines oudined in the CDMP. <br /> 8.2 Various proposed tree locations will need to be adjusted to remove conflict with utilities. <br /> Please let me know if you have any questions oz need additional infarmation. <br /> Sincerely, <br /> BOLTON&MENK,INC. <br /> ������ <br /> Robert E. Bean,Jr., P.E. <br /> Water Resources Engineer <br />