My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
02-16-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 3:30:07 PM
Creation date
8/14/2012 3:29:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� f <br /> ` ' . <br /> • ���'r�� <br /> JAN � 8 2010 <br /> C��iY OF ORONO <br /> Performance Standards of Wetland Establishment <br /> 1) Year 1 <br /> This paragraph applies to the first fu11 growing season after wetland mitigation and buffer <br /> establishment. Seedlings of at least 4 native species shall be widely dispersed through the <br /> wetland. No areas of baze soil larger than 16 square feet shall exist. There sha11 be no <br /> more than 10%total coverage of exotic,non-native, or invasive vegetation(such as <br /> cattail)within the mitigation and buffer areas. <br /> 2) Year 2 <br /> This refers to the second full growing season after wetland establishment. The wetland <br /> sha11 contain at least 30% of all species conta.ined in the specified seed mix. No areas of <br /> bare soil larger than 9 square feet sha11 exist. There shall be no more than 10%total <br /> coverage of exotic,non-native or invasive vegetation within the mitigation and buffer <br /> areas. <br /> 3) Years 3-5 <br /> This section refers to yeaxs 3 through 5 after wetland establishment. The mitigation and <br /> buffer areas shall contain 40% of a11 species contained in the specified seed mix.No areas <br /> of bare soil larger than 4 square feet shall exist. There shall be no more than 20%total <br /> coverage of exotic,non-native or invasive vegetation within the mitigation and buffer <br /> areas. <br /> Maintenance Responsibility � <br /> The applicant is responsible for completing the items of the Wetland Maintenance Plan <br /> and Performance Standards. Monitoring of the wetland mitigation and buffer areas will <br /> be completed by a wetland scientist for a period of five years or until the mitigation <br /> basins exhibit wetland characteristics as proposed in the Wetland Permit Application. An <br /> annual monitoring report outlining the progress of the mitigation basins will be provided <br /> to the Minnehaha Creek Watershed District and the U.S. Army Corps of Engineers. If the <br /> presence of an invasive, non-native plant species is observed during the annual <br /> monitoring event,the applicant is responsible for immediate removal of the invasive, <br /> non-native plant species following the procedures outlined in this plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.