Laserfiche WebLink
� �. <br /> 14. HOW PROPOSED REPLACEMENT WII�L BE ACCOMPLISHED: Indicate how proposed replacement will be accomplished(check only one box below <br /> and continue as indicated): <br /> ❑A Wefland banldng credits only <br /> Complete Application for Withdrawal of Wetland Credits Form and include with your application. Copies of this form are available&om your LGU,or <br /> download a copy from www.bwsr.state.mn.us <br /> Skip to Section 19,page 6(You do not need to complete Sections 15-18). <br /> �B. Project-specific replacement only <br /> Continue with Section 15 below. <br /> ❑C. A Combination of wetland banking and project-specific replacement.If using project specific replacement that will result in surplus wefland credits <br /> that you propose to deposit in the state weUand bank for future use,then you must submit a wetland banking application d'uectly to your LGU before or <br /> concurrenUy with submittal of this form.Also,Complete Application for Withdrawal of Wetland Credits Form and include with your application. Copies <br /> of this form and the weUand banking application is available from your LGU,or download a copy from www.bwsr.state.mn.us <br /> Continue with Section 15 below. <br /> 15. DESCRIPTION OF REPLACEMENT WETLAND(S)CONSTRUCTION(Complete this section only if you marked Boa B or Boa C in Section <br /> 14 above): <br /> Describe in detail how replacement weUand(s)will be constructed. If several methods will be used,describe each method. Details should include the <br /> following:1)type of conshvction(such as excavated in upland,restored by tile break,restored by ditch block or revegetated);2)type,size and <br /> specifications of ouflet structures;3)elevations relafive to Mean Sea Level or established benchmarks or key features(such as sill,emergency overflow or <br /> structure height);4)what best management practices will be implemented to prevent erosions or site degradation;5)proposed timetable for starting and <br /> ending the project;and 6)a vegetation management plan. Write this description on a separate sheet of paper labeled DESCRIPTION OFREPLACEMEIVT <br /> WETLAIVD CONSTRUCTION. <br /> Please see attached narrative <br /> 16. SURPLUS WETLAND CREDTTS: If using project-specific replacement(Box B or Box C in Section 14 above),will the replacement result in any <br /> surplus wefland credits that you wish to have deposited in the State Wetland Bank for future use7 ❑Yes �No. If yes,submit a Wetland Banking <br /> Application directly to your LGU before or concurrently with submittal of this form.Copies are available from your LGU,or download a copy from . <br /> www.bwsr.state.mn.us <br /> 17. DESCRIPTION OF REPLACEMENT WETLANDS: Complete the chart below:1)Use one row of boxes for each wefland replacement site;2)If <br /> your project has more that one wetland replacement site,reference your overhead view(part of Sec6on 5)to this chart by identifying and labeling"first <br /> replacement site"and"second replacement site"on your overhead view;3)If you are identifying only one wetland type within a given replacement site,use <br /> the first dotted line(s)and leave the others blank;4)If you have chosen to identify more than one weUand type in a given replacement site,use the extra dotted <br /> lines to indicate each sepazate wefland type,and identify type(s)of replacement credits and"restored or created"for each separate wetland type with that <br /> replacement site;5)If you do not have access to some of the information, or if you do not Imow your replacement ratio,call your LGU or SWCD office for <br /> assistance. Pholocopy chart for more wetland rep[acements,if needed) <br /> DESCRIPTION OF REPLACEMENT WETLANDS <br /> Identify Watershed County Section, Wetland Type(s)of replacement credits Restored <br /> Wetland name or Township, Plant . (in acres orsquare feet) or <br /> replacement number Ran e Community created? <br /> site (ifknown) g Type� New Wetland Public Value Indicate <br /> (as nofed on Bank Service Credits(NWC) Credits (PVC) R or C <br /> overhead view) Area � <br /> Name of WS#20 Hennepin 36, 118N, sedge 8,341 SF C <br /> First Bank 23W meadow <br /> replacementService ---------------- ------------------- ------------------------ ------------- <br /> site Area#7 upiand 8,341 SF C <br /> . buffer <br /> ---------------- ------------------- ------------------------ ------------- <br /> Name of <br /> second ---------------- ------------------- ------------------IAN <br /> replacement � 8 ���� <br /> site ---------------- ------------------- -------------- <br /> ---------- ------------- <br /> CITY F'ORONO <br /> If you are identifying only one weUand type within a given wetland impact area,use the 8,341 SF 8,341 SF <br /> first dotted line and leave the others blank. If you have chosen to identify more than one TOTAL NWC TOTAL PVC <br /> wefland type within a given wetland impact area,use the extra dotted lines to indicate each <br /> separatewetlandtype,andidentifypredominantvegetationandsizeofimpactedareafor REQUIRED REPLACEMENT RATIO' <br /> each separate wetland type within that impact area. • <br /> (If known) 2:1 <br /> Wetland plant community type: Shallow open water: Deep marsh: Shallow Marsh: Sedge meadow: <br /> Fresh wet meadow:8,341 R'et to wet mesic prairie: Calcareous fen: Open bog or coniferous bog: Shrub carr or alder thicket: <br /> Hardwood swamp or coniferous swamp: Floodplain forest Seasonally flooded basin <br /> *See Wetland Plants and Plant Cammu�:ities ofMinnesota and Wisconsin(Eggers and Ree�I99�as modified by the Board of Water and <br /> Soil Resources,United States Army Corps of Engineers. � <br />