My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
02-16-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 3:30:07 PM
Creation date
8/14/2012 3:29:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> . � i `r <br /> � RECEIVED <br /> Ms. Barbara Walther . <br /> Ms. Becky Houdek � , <br /> Mr. John Smyth ,IAN 18 2010 <br /> January 15,2010 CITY OF ORO <br /> Page 6 � <br /> recently created mitigation basin,MFRA examined and surveyed Mitigation$asins A and B during <br /> the 2009 growing season to ensure that the created basin areas meet the proposed wetland mitigation <br /> areas. Based on the survey of Mitigation Basins A and B,the applicant created an excess of 12,722 <br /> SF of wetland area. Furthermore,the applicant has received complaints regarding the location of <br /> Mitigation Basin C in relation to the golf course fairway from it's members. In order to appease it's <br /> members,the applicant would like to abandon Mitigation Basin C and utilize a portion of the excess <br /> wetland area located at Mitigation Basins A and B in exchange for the area that was proposed at� <br /> Mitigation Basin C. Mitigation Basin C would be graded back to the pre-existing elevations, seeded <br /> with a turf grass seed mix and maintained as a part of the golf course. After utilizing the 8,755 SF of <br /> wetland area as replacement for Mitigation Basin C,the applicant still has an excess of 3,967 SF of <br /> wetland credits at Mitigation Basins A and B. The applicant intends to utilize the excess wetland <br /> areas previously created for replacement of the 2009 pond expansion project. In addition,the ' <br /> applicant provided an excess of upland buffer adjacent to Mitigation Basin B in order to meet the <br /> requirements of the City of Orono. Approximately 23,236 SF of excess upland bufFer(above and <br /> beyond what the WCA requires)was established adjacent to Mitigation Basin B. In order to meet the <br /> wetland replacement requirements for the 2010 wetland pernut application,the applicant wishes to <br /> use a portion(25% of 8,184 SF or 2,046 SF) of the excess upland buffer as replacement credits. <br /> Attached to tlus report is a spreadsheet that surnnlarizes the wetland mitigation proposed in 2009, <br /> created in 2009,the difference between what was proposed and actually created, and what the <br /> applicant is proposing as a part of the 2010 wetland pernut application. <br /> The applicant will provide on-site wetland mitigation by converting an upland area into a wetland <br /> and establishing an upland buffer adjacent to the wetland mitigation basin. Wetland creation is � <br /> proposed adjacent to previously created Mitigation Basin B,which is located near delineated <br /> Wetland 3 in the western portion of the subject property. The following section provides additional <br /> information for the proposed mitigation basin and upland buffer. <br /> Miti�ation Basin B <br /> Previously created Mitigation Basin B will be expanded by converting 0.16 acres (7,154 SF) <br /> of upland into wetland by removing approximately one to two feet of topsoil. Because the <br /> WCA only allows wetland credit for 75% of the total upland area converted to wetland,the <br /> applicant will receive 0.12 acres (5,366 SF) of wetland credit for the converted area. <br /> The proposed wetland mitigation area will exhibit 1 to 2 inches of standing water during the <br /> . early portion(ApriUMay) of the growing season giving way to saturated conditions during <br /> the remainder of the growing season,which was observed in the recently created Mitigation <br /> Basin B during site visits in 2009. The bottom of the mitigation basin will be left rough <br /> graded to create an undulating bottom of+/- 0.5 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.