My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
03-21-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
8/25/2016 10:35:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, Item 5 <br /> Date Application Received: 02/17/16 <br /> Date Application Considered as Complete:02/17/16 ���0 <br /> 60-Day Review Period Expires: 04/17/16 <br /> To: Chair Leskinen and Planning Commission Members ��'� �, <br /> Jessica Loftus, City Administrator �k�sHo�`` <br /> From: Melanie Curtis, Planner mcc <br /> Date: 15 March 2016 <br /> Subject: #16-3813, Dale Gustafson o/b/o Matt Burns, 1180 Loma Linda <br /> Variances <br /> Public Hearing <br /> Application Summary: The applicant is requesting hardcover and lake setback variances in <br /> order to construct retaining walls within 75-feet of the lake to support the slope. <br /> Staff Recommendation: Planning Department Staff recommends a partial approval as noted <br /> on Page 5. <br /> List of Exhibits <br /> Exhibit A. Application <br /> Exhibit 8. Practical Difficulties Documentation Form <br /> Exhibit C. Survey <br /> Exhibit D. Submitted Hardcover Calculations <br /> Exhibit E. Proposed Site/Landscape Plan and Wall Cross-Sections <br /> Exhibit F. Aerial Photos <br /> Exhibit G. Site Photos—by owner <br /> Exhibit H. Site Photos—by Staff <br /> Exhibit l. Property Owners List <br /> ExhibitJ. Plat Map <br /> Background <br /> In February 2015,the City issued a permit for an in-kind rebuild of the existing boathouse on the <br /> property. The boathouse reconstruction is now complete;the final step for the property owner <br /> to complete this spring is the final lake yard landscaping. In order to stabilize the portion of the <br /> slope between the existing stair and the boathouse the applicant is proposing tiered retaining <br /> walls on the south side of the boathouse with vegetative screening. Because the retaining walls <br /> are not considered an allowed structure within the 75-setback, a variance is required. A 1.5 foot <br /> wall is also proposed on the north side of the boathouse to facilitate a continuous flat yard right <br /> at lake level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.