Laserfiche WebLink
• ���� ��� �'"�` �„�j ,' PC EX�Ibit F <br /> Melanie Curtis `���' <br /> From: Melanie Curtis � �;+ <br /> Sent: Tuesday, March 10,2015 9:42 AM ��� <br /> To: 'janemorrison63(c�gmail.com'; 'janemorrison(�century211uger.com' � <br /> Subject: 2750 Casco Point Road <br /> AttachmeM.s: map.pdf; Building Neight 2414.pdfi Hardcover Information Padcet-2014.pdf; Structurai <br /> coverage 2014.pdf; Survey Requirements-March 2014.pdf <br /> See below; piease let me knaw if you have questions. <br /> PID 20-117-23-24-0419(Lots 8&9-South Parcel with detached garage} <br /> • Fuily assessed for local water <br /> • Fully assessed for local sewer <br /> • Sewer maps indicate one sewer stub at SW corner of Lvt 8,very likely in use to serve home on PID 20-117-23- <br /> 24-0020 <br /> � No water stub estabEished for this Iot <br /> PID 20-117-23-24-0020�Lots 10&11-North Parcel with house) <br /> • Fully assessed for local water <br /> + FuEly assessed for local sewer <br /> + 5ewer maps indicate na stub installed for this parcel. It appears sewer Is connected via stub at SW corner of Lot <br /> 8, PID 2a117-23-24-0019 <br /> � Water stub established for this lot <br /> Conclusion for PID 20.117-23-24-0019,if sold separately <br /> + Existing sewer connection acrass this property to service PID 20-117-23-24-0020 must be abandoned <br /> 8 There would be additional contractor fees associated with abandoning#he existing sewer line <br /> • At the time a new home is proposed: <br /> 0 7here would be no local sewer or water cfiarges <br /> o There would be a Sewer Availability Charge (SAC};the 2015 SAC fee is$2,485.OQ. This fee is determined <br /> by the Metropoiitan Council Environmental Services(MCES), coilected by the City and passed on to the <br /> MCES. <br /> o There would be additional contractor fees associated with connecting sewer to new home <br /> o There would be additional contractor fees associated with creating a new water stub to service n new <br /> home <br /> Conclusion for P[D 20-117-23-24-0020,if sold separately <br /> • There would be additional cont�actor fees associated with estab{ishing a new sewer stub to servlce this PID <br /> f There would be no local sewer or water charges due <br /> Ad�,y.the Zoning�egutrements a{�as follows• <br /> The LR-1C zoning district requires a minlmum of 21,78d square feet (0.5 acre) in area and 100-feet in wtdth for a <br /> oonforming lot. The setbacks for principal structures In LR-iC are as foilows: <br /> -350 - i h 1 n�. <br /> (a) Height. No structure or build(ng In the LR-1C district shall exoeed 2�i�z stories and shall not exaeed 3p feet in heighi <br /> exoept as prov(d� in s�ection 78-1366 <br /> (b) Lots. The following minimum requErements shall be observed: <br /> �._ ......�.`__. ..._._.___.' ' ' " __�_.'�" '" <br /> Lot ; Lot :M Frant � Side .�.; �__. -Rear Side Yard <br /> -- --..�__---__.._--�..__._— � <br /> 1 <br />