My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
02-16-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
8/25/2016 9:13:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Many roads approaching 30-40 years in age and increasing pressure is expected toward the city to <br /> 4 Private roads standards/pollaes take them over and fix them up—A policy should be devebped to respond to these�equests. 14 <br /> Roseville or Richfield was recernly(11/15}profiled m the paper as an example of a process <br /> Create an option whereby a landowner can obtain approval for extending the every 3 year pumping <br /> 19 Septic Code updates regarding pumping requirement on a year-tty-year basis where documentation is provided and a management plan 13 <br /> maintenance intervals&Type IV systems agreement fs entered Into requiring verification that septic tanks are not needing to be pumped yet, <br /> especially ln the case of Big Island where the transportatlon cost is exceedingly hlgh <br /> Slope failure and Stabilization Ordinance or There is an opportunity to improve the process of dealing with slope failures before they occur and <br /> 8 Polic.y in emergency situations;standarcis,review process,collaboration with MCWD,etc.would benefit 12 <br /> residents. <br /> Code allows certain aaessory structures(pools}within a certain size to be built in front of the <br /> 36 Accessory structures and pools P��PaI building,outs+de of the required yard.Historically,staff has not permitted any structure. 1Z <br /> Further,78-1436 allows for a 15 side yard setback for aaessory structures between 750 and 1000 <br /> sq ft. Setbacks for accessory structures shoufd be reviewed <br /> 7 Sewer Connection Charges Policies The existing system of determining connection char�es should be reviewed to ensure they are lZ <br /> equitable and uniform. <br /> 37 Appeal time frame 7he appeals process as outlined in 2-41 does not stipulate a timeline for fifing the appeal. There 11 <br /> should be a cleadline to avoid rotraded processes. <br /> 18 Septic Code Review the Septic code,compare with State/County requirements. Determine if the difFerances are il <br /> worth the added layer of review and permitting. <br /> The statute allows for certain subdivisions to be revlewed dlfferently,sklpping a planning <br /> 29 Lot splits rnmmission process. could be reviewed and do not need to he,adding time,expense,and 9 <br /> roadblocks unnecessaril . Changes could save staff and appllcant time. <br /> 16 Special lot combinat(ons Special lot combos should be clarified to exclude non-riparian lots in calculation of average 8 <br /> lakeshore setbacks. Drafted,need to schedule. <br /> 1 Comp Plan text/map amendments re:densities Tfte Comp plan notes certain denslty ranges. The future Comprehensive Plan should be clear as to 8 <br /> in certain distrlcts the oal of certain districts in terms of density and development patterns. <br /> 24 Vacation Rentals Residents are rerrting their homes on a short term basis. Renters'behavior impacts the peace and $ <br /> enjoyment of the rest of the neighborhood. Vacation rerrtals should be regulated. <br /> 9 SWMP-zoning code revisions to formalize Qrdinances codifying the Surface Water Managemerrt Plan standards must be adopted to fully ? <br /> implementation implement the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.