My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
02-16-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
8/25/2016 9:13:01 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Plat Application 1b-3807 <br /> Orono Preserve <br /> Page 3 <br /> deemed necessary should be submitted prior to final agproval, or the plans should be revised to <br /> maintain all wark on site. <br /> 4.4 General Crrading Notes should be revised to indicaze a minimum 6"topsoil used for re-sgread. <br /> 4.5 Low opening elevations for lots adjacent to the ponds and wetlands need to be raised as necessary <br /> to provide a minimum 2' vertical separation to the 100 year high water levels. Lots 1�and 16, <br /> Block 4 appear to�uire adjustment <br /> 4.6 Grading on the north side of Lot 1,Block 3 should be adjusted to direct backyard drainage to the <br /> proposed catchbasin on Street B. <br /> 5.4 GRADING PROFILES: <br /> 5.1 Profiles should be adjusted as necessary to provide a minimurn k-value of 15 for crest vertical <br /> curves and 26 for sag vertical curves(standard for a 25 mph design). <br /> 6.0 EROSION AND SEDIMEI�IT CONTROL PLAN: <br /> 6.1 Notes should be revised to indicate perimeter erosion control measures and protection fencing will <br /> be installed by Contractor and inspected by City prior to any demolition or land disturbance. <br /> Contractar must provide 24 hour notice prior to inspection. <br /> 6.2 Plans indicate proposed permanent stormwater management basins will be used for temporary <br /> sediment basins during construction. Additional sequencing notes and linework should be <br /> included as necessary to provide clear direction for installation schedule of perimeter sediment <br /> control devices,temparary sediment basins,rough grading and temporary ditching,temporary <br /> seeding,utility and street construction,site stabilization(including topsoil re-spread,erosion <br /> control blanket,ripxap, and permanent vegetation),removal of perimeter measures,consituction <br /> sediment removal, ouflet control structure installation,and permanent stabilization of the ponds. <br /> 6.3 Dou61e siltfence must be p�rovided adjacent to wetlands where grading is pr�posed within 50' of <br /> the wetland <br /> 6.4 Siltfence location should be revised as necessary to be located entirely within project boundaries. <br /> 7.0 SANTTARY SEWER AND WATfiR MAII�PLAN <br /> 7.1 The plan view should be eapanded ta sbow work proposed for connection to e�sting sanitary sewer <br /> in the intersection of CSAH 112 and Old Crystal Bay Road. <br /> 7.2 Rims and inverts of proposed sanitary sewer manholes and pipe characteristics(size,length, slope, <br /> and material) should be indicated on pIan so sewer can be adequately reviewed. <br /> 7.3 An 8"sanitary sewer trunk Iine should be installed at minimum grade to the end of SCraet D and then <br /> north along the property line,terminating on die northwest corner of Lot 1,Block 1. <br /> 7.4 Sanitary sewer appears to be in conflict with the stortn sewer and easements on the norkh end of <br /> Street C. Utility alignments should be adjusted as necessary Eo reznove conflicts. <br /> 7.5 General Utility Notes indicate C900 PVC will be used for watermain,but the plan label indicates <br /> DIP will be used. Notes and plan should be revised to be cansistent. <br /> 7.6 A 12"trunk watermain line shoe�ld be installed adjacent to the trunk sanitary line, terminating in a <br /> temporary hydrant on the northwest corner of Lot 1,Block 1. <br /> 7.7 Watermain on 3treet B shauld be placed on the north side of road to accommodate stoim sewer on <br /> the south side. <br />
The URL can be used to link to this page
Your browser does not support the video tag.