Laserfiche WebLink
Melanie Curtis <br /> From: Melanie Curtis <br /> Sent: Tuesday, August 25, 2015 4:20 PM <br /> To: 'Ted Martin' <br /> Cc: jamesrandrobin@comcast.net <br /> Subject: RE: 1050 Edgewood Hills Meeting <br /> Attachments: 1050 Edgewood Hills.pdf <br /> Ted <br /> Please see my list of responses below. I hope I hit all of the outstanding issues or questions. <br /> • The"armored slope"on the NE corner should be treated as a retaining wall and have an engineered design to ensure <br /> it does not fail. If grading up to/on to neighboring properties, a written consent to do so from the affected neighbor <br /> must be received with the building permit application. <br /> • The driveway as depicted exceeds the City's standards. (Max width for the curb cut is 20ft.; min width is 8 ft.) <br /> • Driveway entrance should be 100 ft from any road intersections. <br /> • With the building permit we would want to see a comprehensive drainage plan to ensure roof and hardcover runoff is <br /> not being directed onto the neighboring property. <br /> • Extrapolated Contours through existing house site appear reasonable for basement calculation. They generally <br /> conform to the extrapo�ated Lidar data from the County. <br /> • The grading on the site should be set back at least 5'from property lines. If grading up to/on to neighboring <br /> properties a written consent to do so from the affected neighbor must be received with the building permit <br /> application. <br /> • Soil density testing will be required in relation to the structural building permits (house, walls, etc) and/or for <br /> engineered slopes. Soil testing will not be required for the other re-graded areas. <br /> • Please see this LINK to the MN Department of Health's page for water supply weil isolation distances. <br /> • There is potential to connect the new sewer line from the house to the existing line connection point within the <br /> subject property (as opposed to the stub at the property line/trunk line). Specific inspections and testing may be <br /> required to provide conclusive direction. Please contact Adam Edwards (Orono's City Engineer/Public Works Director) <br /> for more detail regarding the new sewer connection. Adam can be reached at 952.249.4661 or by email at <br /> aedwardsCa�ci.orono.mn.us <br /> • The pool equipment must be located behind the setback line. The Code does not aliow for an encroachment of pool <br /> equipment into the setback. <br /> Let me know if I failed to answer all questions. �i s�z-�ssas www.jamesrobfr.com james(�jamesrobin.00m <br /> Melanie <br /> watercolors and landscape architecture <br /> Melanie Curtis 22732 olgilvie avenue north <br /> �952.249.4627 �mcurtis@ci.orono.mn.us scandia, minnesota 55073 <br /> From:Ted Martin [mailto:ted@pkarch.com] ' a m e s ro b i n <br /> Sent: Friday, August 21, 2015 2:13 PM � <br /> To: Melanie Curtis<MCurtis@ci.orono.mn.us> <br /> Cc:jamesrandrobin@comcast.net <br /> Subject: 1050 Edgewood Hills Meeting <br /> Melanie, <br /> Thank you for meeting with us this morning. <br /> It is helpful to discuss our intentions with you and make sure we're covering all the bases. <br /> Attached are: <br /> - Meeting minutes—Please let us know if there is anything requiring correction. <br /> � <br />