My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-2009 Planning Commission Packet
Orono
>
Planning Commission
>
2009
>
10-19-2009 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2012 11:33:08 AM
Creation date
8/6/2012 11:32:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� 2335 Highway 36 W <br /> St Paul,MN 55113 <br /> Te1651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> September 29, zoo9 �'Bonestroa <br /> Ms. Melanie Curtis <br /> Planning and Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 09-3431 3165 North Shore Drive <br /> File No. 000139-09000-1 <br /> File No. 09-3431 <br /> Dear Melanie: <br /> We have reviewed the plans for the proposed grading project located at 3165 North Shore Drive. <br /> The plans are dated 9-16-09. We have the following comments with regards to engineering <br /> matters: <br /> • The grading plan shows a berm and swale along the north property line that changes the <br /> existing drainage patterns. This may increase the amount of runoff directed toward 3155 <br /> North Shore's driveway. We recommend that the applicant provide one of the following <br /> three items addressing this situation. <br /> o Provide drainage calculations showing no increase in the pre and post project <br /> runoff rates for the 2, 10, and 100 year storms at the northeast lot corner. <br /> o Provide evidence that this plan is acceptable or a drainage easement from the <br /> owner of 3155 North Shore Drive. <br /> o Revise the grading plan to accept runoff near the northeast corner. <br /> • This project will disturb more than 100 CY of material. Sediment and erosion control <br /> information meeting the requirements of Orono's City Code 79-7(c)(2) must be <br /> submitted. The minimum $2000 sediment and erosion control financial security should <br /> - be required of the applicant for this permit. <br /> • This project hauls in a significant amount of fill material. The applicant has provided <br /> estimates of 2267 cubic yards which equates to approximately 225 truck loads. It <br /> appears that there are two ways trucks could access the site. One through the Bohns <br /> Point Road driveway and the other through the shared 3165 North Shore Driveway. The <br /> erosion control plan should identify the haul route and identify BMPs assuming <br /> considerable tracking will occur. <br /> • If the haul route uses the shared 3165 North Shore Drive driveway, an agreement should <br /> be in place with the driveway owner(s)or neighbors that documents the existing <br /> pavement condition and spells out specific remedies should damage occur during this <br /> project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.