Laserfiche WebLink
DIVISION 2. <br /> BASIC APPLICATION AND PLAN REQUIREMENTS <br /> Sec. 78-1634 Application Requirements and Procedures. The developer shall follow <br /> the steps outlined below as part of the development review process: <br /> 1) Review and respond to the Goals and Policies for Environmental Protection and <br /> Natural Resource Manaaement n���� "T�*„Y�' D°�^„��° c•.�*°-�� .,r��*°Y D'�� as <br /> established in the Orono Community Management Plan and the recommendations <br /> contained within the Orono Natural Resources Inventory. The intent is to <br /> establish the property's ecological connections both within Orono and as part of <br /> the regional ecological system. <br /> 2) If the property eYists adjacent to a documented corridor in the Rural Oasis Study, <br /> review and respond to the existing aesthetic and ecological analysis. <br /> 3) If the property is not adjacent to a documented corridor in the Rural Oasis Study, <br /> developer shall have a qualified consultant prepare a similar analysis and submit it <br /> to the City for review. This analysis shall include the documentation of views, <br /> corridor enclosure, and landmarks through a plan analysis and photographs. <br /> Developer shall be charged a standard fee established in the City Fee Schedule to <br /> cover the eYpenses of the City in hiring a consultant to review the ecological site <br /> analysis submitted by the developer. <br /> 4) Additionally, submit a natural resources inventory of the site, includinb all of the <br /> following elements: <br /> a) Review of the MLCCS data pertinent to the site <br /> a-� Tree survey, including all significant individual trees greater than 6" <br /> diameter, and stands of trees, identifying tree species and size. <br /> �� Wetland inventory, including delineation reports; and <br /> E d) Topographic survey indicatin� existing drainage patterns. <br /> � Analvsis of the site based on the findings and recommendations of the <br /> Orono Natural Resources Inventory with re�ards to: <br /> - Conceptual reen�vays and open space conidors <br /> - Existence of rare plant communities <br /> - Potential need for proactive manaaement and protection <br /> Sec. 78-163� Basic Conservation I�esig� 1Vlaster Pl�n Requirements and Evafuation <br /> Criteria. The developer shall prepare a Conservation Design Master Plan for <br /> development of the property, consisting of written and visual documentation including <br /> maps in an acceptable electronic format, addressing the following topics: <br /> 1) Consideration of the existing drainage system; <br /> 2) Establishment of a stormwater management system, using multi-cell <br /> treatment principles; <br /> Page 3 of 7 <br />