Laserfiche WebLink
. � /,� � Z <br /> + CITY OF ORO\'O SEPTIC SYSTEI�I PERlZ�IIT APPLICA'ITON <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, Ni�t 5�323 <br /> Jos srr� aDD�ss: � .3-�� ��� ��'�- /��� �l <br /> Occupanc�• Type: Residential /� Commercial Other <br /> _ ____ ;_� <br /> Permit T`•pe: i�'eiv r Replacemen�System, $100.00 � <br /> Re ai�xis�irig System, $ 50.00 <br /> P <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> O�mer's I�'ame: ��-r'�� PhoneNumber: <br /> Nlailing Address: City: �p� <br /> Contractor's Name•� G�� �-yvL PhoneNumber: -��' �f 7� -/7l� Z <br /> Nlailing Address: �l0 3 ��"— S-� S � City: �cx�-�- Zip: s"S� 3�3 <br /> DO \TOT 1�IAIL PA'YI�IENT WTTH THIS APPLICATION <br /> GEtirERAL I�'STRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must no[begin unless the permit card is on the job <br /> site. <br /> 2. Pernaiu v.�ill be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The followin; inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> afcer rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipinJ installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin�NIPCA Installer Certificate shall be present durinJ inspections: A 24- <br /> hour notice is required for all inspections. <br />