My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1999 Council Minutes
Orono
>
City Council
>
Minutes
>
1990-1999
>
1999
>
01-25-1999 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2012 4:39:16 PM
Creation date
8/1/2012 4:39:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO CITY COUNCIL MEETING <br />MINUTES FOR JANUARY 25, 1999 <br />(Mayor /Council Report, continued) • <br />Mayor Jabbour indicated that he has spoken with Ron Moorse about scheduling a meeting <br />with the Mayor of Mound, the Mayor of Spring Park, the Mayor of Minnetonka Beach and <br />the Mayor of Wayzata to discuss this issue. <br />Mayor Jabbour commented that he would like to schedule an early morning "town meeting" <br />every Saturday in March to discuss issues pertaining to the City of Orono which would enable <br />the citizens to meet with the Mayor on an informal basis. <br />Mayor Jabbour remarked that with the year 2000 approaching, more and more of the local <br />residents are acquiring generators for their private use. <br />Gappa commented that NSP has been experiencing problems with some of these generators <br />due to incorrect installation. <br />Mayor Jabbour stated the citizens should be made aware of the steps that Orono is taking to <br />ensure that those problems will not occur in the year 2000, and that the residents follow the <br />proper steps in installing a generator. <br />Kelley suggested the Uniform Building Code be reviewed to see if some licensing procedure <br />needs to be followed as well as an inspection of the generators once installation is completed. • <br />Gappa stated this issue can be included in the spring newsletter. <br />ENGINEER REPORT <br />*( #11) ORDER FEASIBILITY STUDY FOR FULLERTON SUBDIVISION <br />SANITARY SEWER - RESOLUTION NO. #4231 <br />Motion by Sansevere, second by Kelley, to approve RESOLUTION NO. #4231, <br />a Resolution Declaring Adequacy of Petition and Ordering Preparation of Report <br />for the installation of sanitary sewer in the Fullerton Subdivision. <br />VOTE: Ayes 4, Nays 0. <br />( #12) FINAL PAY REQUEST - NORTH LONG LAKE SANITARY SEWER <br />PROJECT <br />Flint commented he does not have a problem with payment of the pay request, but has a <br />concern over the number of change orders that have occurred on this project and the amount <br />of money involved. Flint inquired whether City Staff could have avoided some of these costs <br />if there had been better supervision of the project. . <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.