My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3108
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 3100 - 3199 (March 23, 1992 - November 9, 1992)
>
Resolution 3108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 1:03:58 PM
Creation date
8/17/2016 1:03:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� -S ' �� <br /> � O� <br /> • O O <br /> A - CITY o� ORONO <br /> � � � <br /> ��� �G'�'� RESOLUTION OF THE CITY COUNCIL <br /> �kESH�g' Np, 310 8 <br /> 4. The applicant shall be responsible for advising the City of <br /> the schedule of hauling activities so that staff can arrange <br /> for the necessary inspections. Prior to hauling any fill to � <br /> the site, the applicant must arrange for a pre-construction <br /> meeting with the Orono staff to review all final submittals <br /> and tentative hauling schedule. The City will ask that a <br /> representative of its Police Department be present at the <br /> pre-construction meeting to advise of any special <br /> traffic/safety concerns during the hauling process. <br /> 5. Hauling activities shall not be conducted during the <br /> following time periods: <br /> 6:30 a.m. to 8: 30 a.m. <br /> 4: 00 p.m. to 6: 00 p.m. <br /> • 6. The applicant shall cease all hauling to the site upon <br /> evidence of shearing and/or other signs of instability <br /> created by filling over the former dump site. Applicant <br /> shal 1 not proceed with hauling until the City Engineer has <br /> had adequate time to review the evidence and submit a <br /> written report to the Council for their review and action. <br /> If Council determines that it is in the public interest to <br /> cease all hauling to the site, this conditional use , permit <br /> shall be terminated immediately and the applicant shall <br /> complete the final grading and seeding of the entire <br /> disturbed area. <br /> 7. Applicant is responsible for up-dating all previous permits <br /> issued by the Department of Natural Resources, Minnesota <br /> Pollution Control Agency, Hennepin County Department of <br /> Environment and Engineering, and M.C.W.D. before the Orono <br /> staff can issue a land alteration permit. <br /> 8. Authorities granted by this resolution run with the property <br /> not with the owner, but are permissive only and the filling <br /> of the site must commence within one year of the date of <br /> Council's approval (April 13, 1993 ). The land alteration <br /> permit shall be valid for a two year period. The land <br /> alteration permit shall be written to specify the specific <br /> time restrictions on this permit. <br /> • <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.