Laserfiche WebLink
( � <br /> PC Exhibit G <br /> � • • • <br /> emo � � <br /> To: Melanie Curtis, Planning <br /> From: Willie Gibbs SSTS Manager ��e��!�� /�'���-''`� <br /> CC: Subdivision <br /> Date: 7/15/2009 <br /> Re: Buttertield Division <br /> Melanie, I have reviewed the proposed septic system site evaluations for the Butte�eld division at 3925 <br /> Watertown road. The evaluations were done by Bemie Miller. The site plan shows finro sites, a primary <br /> and an altemate site for each proposed lot. The areas set aside for each proposed mound system <br /> appear to be adequate and on contour. The areas should be staked off and no traffic allowed over the <br /> proposed sites. <br /> The information that was submitted was a preliminary evaluation only and not a full design. A complete <br /> design will need to be done for each new house based upon final house plans. Two copies of the <br /> design are required at the time of the building permit appfication. <br /> 1 <br />