My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2009 Planning Commission Packet
Orono
>
Planning Commission
>
2009
>
07-20-2009 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 12:36:08 PM
Creation date
7/31/2012 12:35:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Moseley Residence <br /> Ulteig Project No.09.01410 <br /> June 16,2009 <br /> Page 3 <br /> some point Ioads at various locations of the existing foundafaon walls. Once finalized <br /> architectuxal and final truss drawings are completed, these point loads should be evaluated <br /> and may require the existing walls to be solidly grouted in these areas. � <br /> PROFESSIONAL OPINION <br /> 3. It is our professional engineering opinion that the existing foundation is struchxrally <br /> adequate to support fhe proposed addition noted above and will meet the requirements of <br /> the Code. � <br /> GENERAL � <br /> 4. The information, observations, and opinions staEed in this report are based on the <br /> preliminary architectural drawings and the site visit noted above. The general contractor <br /> shall inspection the existing materials, observing aIl structural elements during construciion <br /> to ensure the exposed and hidden materials are in adequate condition. If any structural <br /> element is found to be deteriorated or darnaged, contact Ulteig immediately. . <br /> 5. The observations and opinions expressed in this report were based on our professional <br /> engineering judgment and professional practice. . <br /> 6. All work shall be done in accordance with this document, standard industry practices, and. <br /> the requirements of the Code. <br /> 7. No other engineering was performed or requested for this project. It is recommended that <br /> Ulteig be consulted to assist in the point load analysis once final drawings have been <br /> completed. <br /> If you have any questions, please contact me. • <br /> I hereby certify that this plan, specification or <br /> Slrtcerely, report was prepared by me or under my direct <br /> � Ulteig Engineers supervision and thaE I am a duly licensed ' <br /> professional engineer under Ehe Iaws of the State ± <br /> of MinnesoEa. <br /> _ ! <br /> Nick Hanson, PE � � <br /> Nick Hanson <br /> Date:� 6-16-09 <br /> i <br /> MinnesoEa Registration No.44774 � <br /> I <br /> i <br /> ��Ep�/E� ? <br /> . J�� � � Zoos <br /> ` ,- ., ^ .__ ..�;�; ... . ���`k'�F' c���n���-, . .. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.