Laserfiche WebLink
. <br /> ,, <br /> LeNeave's Plat <br /> Preliminary Plat Requirements <br /> l. Application,Certified Property Owners List, and Fees <br /> 2. Preliminary plat drawing prepared by a surveyor,showing wetland as delineated,proposed <br /> drainfield locations, and existing house. <br /> • 3. Grading plan showing proposed driveway <br /> 4. Septic including two drainfield sites for the new lot and either a certification of the existing <br /> system and an alternate drainfield location or two drainfield sites for the existing house lot. <br /> 5. Rezoning application (for wetland fill and mitigation) <br /> 6. Other items as requested by Planning Commission or Council during Sketch Plan <br /> Estimate of Fees* <br /> Preliminary Subdivision Plat Application: <br /> Preliminary Subdivision Application $700 <br /> Septic System Site Evaluation Review($60.00 per lot x 21ot) $120 <br /> Application Escrow(guarantees payment of City's consultant costs) $2,500 <br /> Estimated cost of City Engineer's review of preliminary plat $500 <br /> (Actual cost will be billed to property owne.r) � <br /> . Rezoning Application: <br /> Application Fee $700 <br /> Estimated cost of wetland consultant's review $500 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Plat Application: <br /> Final Subdivision Application, including Legal Review and Filing <br /> (w/covenants)(Covers first review of documents, if additional time is <br /> required,those costs will be billed to the property owner.) $600 <br /> Storm Water and Drainage Trunk Fee $3,330/acre <br /> (paid for the entire plat) <br /> Park Fee(8%of Fair Market Value), but no less than $3,250 to <br /> $3,250/per lot and no more than$5,550 per lot x 1 lots• $5,550 _ <br /> Estimated cost of City Engineer's review of final plat $500.00 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Application Fee is paid with the application. Storm Water and Drainage Trunk Fee, <br /> Park Fee and consultant costs are paid before final plat is recorded. <br /> *Based on 2009 Fee Schedule -� <br />