My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3045
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 3000 - 3099 (August 12, 1991 - March 30, 1992)
>
Resolution 3045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 12:26:37 PM
Creation date
8/17/2016 12:26:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 3045 <br />3. The applicant shall execute covenants to define responsibility <br />for construction and maintenance of the driveway in Outlot A, and <br />to define future financial obligation of the owners of Lots 1, 2 <br />and 3 at such time that the driveway is upgraded to a private or <br />public road status. <br />4. Any future development of the property that creates additional <br />residential lots using Outlot A for access will trigger the <br />upgrade of Outlot A to the road standards in effect at that <br />future time. <br />5. The applicant shall grant to the City an underlying road and <br />utility easement over Outlot A. <br />6. Standard perimeter drainage and utility easements shall be <br />granted over the entire plat. <br />7. Drainage improvements to the property shall be constructed per <br />• the drainage and grading plan as approved by the City Engineer, <br />subject to a Developer's Agreement to be executed between the <br />City and the developer. Private driveway and drainage <br />improvement construction can begin as soon as the engineering <br />plans for such improvements have been approved by the City and <br />the Developer's Agreement has been executed. <br />8. Applicant shall pay the standard park fees for Lots 1 and 2 per <br />the current Park Fee Ordinance. <br />9. A drainage easement shall be dedicated on the plat over the <br />existing pond in Lot 3 and over the retention pond area in the <br />northeast corner of Lot 3. <br />10. Protection of drainfield sites via fencing shall be in place <br />during construction of driveway and drainage improvements, and <br />shall remain in place until the residences on Lots 1 and 2 are <br />completed. <br />11. Dedication on the plat of 33' of right-of-way for Watertown Road <br />shall be granted. <br />12. Outlot A shall be given a new road name and address assignments <br />for Lots 1 and 2 and shall be consistent with the north/south <br />grid system. <br />• Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.