My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-2008 Planning Commission Packet
Orono
>
Planning Commission
>
2008
>
02-19-2008 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2012 8:15:56 AM
Creation date
7/27/2012 8:15:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. PC Exhibit E <br /> • , . ����. <br /> � � JAN 1 � 2008 <br /> CITY OF ORONO <br /> 1/11/2008 � <br /> Evelyn Turner <br /> City Of Orono � <br /> 2750 Kelley Parkway � <br /> Orono, MN 5 5 3 66 <br /> Subject: Zoning application #07-3330 <br /> Dear Evelyn: <br /> In response to your letter dated October 22, 2007 please <br /> �find the following: <br /> 1. Stamped plans from a Professional Engineer and a letter <br /> discussing the stair removal issue. . <br /> 2. You will also find a bloum up version of the survey from <br /> the �survey company (Gronberg & Assoc.) where the stairs <br /> come down. the hill. Gronberg & Associates says that this is <br /> as close a plan as they can detail and that the very bottom <br /> of the wall edge at the bottom of the last stair is within an <br /> inch or 2 from the Iine and that the top of the wall edge at <br /> the top of the 1 St stair is about 4 inches or so from the lot <br /> line, and that each stair thereafter gains that much more <br /> from the lot line. This would put our new overlay stairway <br />
The URL can be used to link to this page
Your browser does not support the video tag.