Laserfiche WebLink
SECTION 4. City of Orono Ordinance No. 40, 3rd Series, the 2008 Fee Schedule, is hereby <br /> � amended as follows: <br /> A. Under the heading CONSTRUCTION PERMITS AND INSPECTION FEES <br /> revise subheading BUILDING PERMIT as follows: � � <br /> Applicable <br /> Permit Tvpe Fee Code Section <br /> BUILDING PERMIT Ord. 216 <br /> Minimum Fee $25.00 <br /> � � '" Normal Fee , ' (per 2008 Building Permit Fee Table Based � <br /> on Valuation) <br /> Plan Review Fee . <br /> Commercial (per 2008�Building Permit fee Tabie Based <br /> - � on Valuation) ,. <br /> Residential 65% of Building Permit Fee . . <br /> Building Valuation Standard (per Current I.C.B.O. Building Standards/ <br /> Building Valuation Data) <br /> Permit Escrow• <br /> New Home/Addition/New Structure $2,500.00 Sec.75-1- 75-9 <br /> Exempt:Permits not involvin�anv anticiaated consultant costs <br /> B. Under the heading CONSTRUCTION PERMITS AND INSPECTION FEES, <br /> revise subheading GRADING,EXCAVATION, FILLING, as follows: <br /> Applicable . <br /> Permit Tvae Fee Code Section <br /> GRADING,EXCAVATION,FILLING � <br /> 500 cubic yards or less � $50.00(staff permit)+actual . . <br /> ' engineering fees if required <br /> $25.00 per each inspection over ls`) <br /> Permit Escrow � � $600.00 Sec.75-1 -75-9 <br /> 501+cubic yards $50.00+Conditional Use Permit <br /> � $25.00 per each inspection over ls` <br /> Permit Escrow $600.00 Sec.75-1-75-9 <br /> NOTE: 501 cubic yards or more requires a Conditional Use Permit unless approved as part of a building <br /> permit. <br /> Page 5 of 6 <br />