My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2011 Council Minutes
Orono
>
City Council
>
2011
>
10-10-2011 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2012 4:19:44 PM
Creation date
7/26/2012 4:07:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, October 10, 2011 <br />7:00 o'clock p.m. <br />(7. #11 -3526 3515 CAPITAL PARTNERS, LLC,1545 MAPLE PLACE, Continued) <br />MCWD does not have any requirements for storm water management facilities that conflict with <br />the currently proposed site and grading plan. <br />McMillan noted there was a fair amount of public comment at the Planning Commission and asked <br />whether there is anyone in the audience that would like to speak on this application. <br />There were no public comments regarding this application. <br />VOTE: Ayes 5, Nays 0. <br />CITY ENGINEER'S REPORT <br />8. ORONO ORCHARD ROAD FEASIBILITY REPORT <br />Amundsen noted in 2006 the City completed a pavement management report and at that time Orono <br />Orchard Road was identified as a road that would require reconstruction. In 2009 a CIP was completed <br />for all the city roads and infrastructure. In the CIP Orono Orchard Road was slated for reconstruction in <br />2012. In December of 2010 the City bonded for a street project, and in August of 2011, the City and the <br />Metropolitan Council finalized the agreement on this road. <br />Amundsen indicated there is an existing 18 -inch force main on the west side of the road. This plan will <br />locate the same type of pipe on the east side of the road. The road reconstruction will start at County <br />Road 15 and will go slightly across the border into Long Lake at the north end. The City is not looking at <br />any major improvements to the storm sewer and will be replacing what is existing. Amundsen illustrated <br />the existing Metropolitan Council lift station on the road, which connects into another force main on the <br />south side of County Road 15. Both the City project and the Metropolitan Council project will have force <br />main work on the north and south ends. <br />McMillan noted that the force main takes all the sewage from Long lake, Maple Plain and the southern <br />side of Medina, which is why the force main is so big. <br />Amundsen pointed out that there will be a twin manhole on the other side of the road and that they will <br />attempt to keep those out of the wheel path of the vehicles. <br />Amundsen stated currently this is an estimate of the street based on the City's maps. Amundsen <br />commented he is aware of people's desires to keep this a rural area but that there are some drainage issues <br />that will need to be addressed. In order to address that, there will be some small bituminous curbs placed <br />on the road. Amundsen noted the heavier dashed lines depict the anticipated location of those curbs. The <br />width of the roadway will not be widened. <br />• <br />Amundsen stated coordination with other government entities will be required on the force main project <br />between the Hennepin County Transportation Department, the Hennepin County Regional Rail Authority, <br />the Minnesota DNR on the Luce Line Trail, and the City of Long Lake. • <br />As it relates to the costs, the City and the Metropolitan Council will be sharing in the costs of the project. <br />Orono's share amounts to $1,226,717 and the Metropolitan Council's share is $2,101,847. A number of <br />Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.