Laserfiche WebLink
� O� <br /> O O <br /> , C ITY of ORONO <br /> ,� �,�.. �, <br /> ti Municipal Offices <br /> ti <br /> �.�9 ¢.�G Street Address: Mailing Address: <br /> x'EgHO 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> AGREEMEN'T TO UPGRADE/REPLACE ON-SITE SEPTIC <br /> S�'S'�EIVi <br /> ` l, �� <br /> I/We, do hereby acl:izowledge <br /> City shal return the check to the Property Owner upon final inspection approval <br /> of the septic improvements. <br /> Name(s) of Owner <br /> that the on-site septic system located at _ ��1 ,����,����� � �� , <br /> Property Address <br /> must be up�raded or replaced to be in full compliance with Section 12.30, <br /> Individual Sewage Treatment System Standards For The City of Orono. I/We <br /> have submitted or will submit soil borin�s, perc tests and a detailed design. <br /> And further, UWe a�ree that such up�radin� or replacement will be completed no <br /> later than six months from the date of this signed agreement. This date may be <br /> extended due to the weather or other uncontrollable circumstances with <br /> permission from the ISTS Pro�ram Coordinator. <br /> Performance I�eposit: For the purposes of assuring to the City that the septic <br /> improvements will be completed according to the terms of this a�reement. the <br /> Property Owner will deposit with the City at the time of signing this agreement a <br /> certified check satisfactory to the Gity providin� that the City is able to cash the <br /> checl: in its sole discretion to complete the septic improvements if the Property <br /> Owner fails to satisfactorily complete the work prior to the completion date. The <br /> City shall return the checic after final inspection approval of the septic <br /> improvements. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />