Laserfiche WebLink
* . <br /> 7. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns froin and against all claiins, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanlcs are <br /> pumped and before the tanks are crushed and filled. <br /> PERMIT TYPE AND FEE CALCULATION <br /> ( $50.00 - Principal Structure <br /> —�- $30.00 - Accessory Structure <br /> � <br /> 1. Subtotal of above permit requested $ J��, 4 c� <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �j`�d. S'U <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit, agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: � Date: � �-�F b <br /> r <br /> OWNER'S SIGNATURE: �/��1�'� Date: � 2- D <br /> APPROVED BY: ��(�c�-._ Date: �'3�'o`'� <br />