My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design - no permit on file
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
507 Ferndale Road North - 36-118-23-13-0007
>
Septic
>
septic design - no permit on file
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:01:19 PM
Creation date
8/16/2016 11:43:20 AM
Metadata
Fields
Template:
x Address Old
House Number
507
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
507 Ferndale Road North
Document Type
Septic
PIN
3611823130007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The total area selected for the mound, including that under the dikes, shall bc roughened in order <br /> to thoroughly break up any existing sod la}�ers and to provide a suitable transition zone betwecn <br /> thc original soil and sand layer of the mound. The area shall be roughened only whcn the <br /> moisture content of the soil 8 inches below the surface is dricr than thc plastic limit. <br /> Surface preparation or roughening may be performed with a mold board plow, a disk plow, or <br /> a back hoe using only the teeth. Mold board plow furrows shall be at least 8 inches deep, shall <br /> be thrown up slope and shall run perpendicular to the slope. There shall be no dcad furrow <br /> undcr the mound. <br /> Disking may be used for surface preparation as a substitutc for mold board plowing in soils <br /> having percolation rates faster than 15 minutes per inch (sand�� loam) in the top 8—inch depth. <br /> Back hoe teeth may be used to roughen the soil surface and brcak up thc sod laycr. Care must <br /> be taken so as not to compact or puddle deeper soil la}'crs: In »o case shall an}� surface soil be <br /> excavated and removcd from the arca. <br /> Mound Construction shall procecd immediately after surface preparation is complcted. Ever}� <br /> effort should be taken to pre��ent rain from fallinQ on the preparcd soil surface. <br /> CONSTRUCTION MATERIALS AND PROCEDURES; DISTRIBUTION OF EFFLUENT: <br /> A minimum of 12" of soil defincd as sand shall bc placcd whcrc thc filtcr matcrial is to bc <br /> located. A crawler tractor with a bladc or bucket shall be used to move the sand into place. At <br /> least 6 inches of sand shall be kept under the trachs to minimizc compacting of the plowed layer. <br /> The sand la}'er upon which the filter material is placcd shall bc le�el. ��r,, <br /> � <br /> Sand is defined as a soil te�ture composed b�� wcight of a least <br /> 25 percent of very coarse, and mcdium sand var��ing in size from ?.0 to 0.?� mm, Icss tha��0 <br /> percent of fine or very fine sand ranging in size between 0.?> and 0.0� mm, and no morc that <br /> 10 perccnt of particics smallcr that 0.0> mm. <br /> A minimum depth of 9 inches of filter material (rock) shall bc placed on thc sand layer prior to <br /> installing the distribution pipc. <br /> Filter material is defined as clean rock, crushcd igneous rock or similar insoluble, durable a�ld <br /> deca}�—resistant material free from dust, sand, silt or clay. The size shall rangc from 3/4 inch <br /> diametcr to 2 1/2 inch diameter. <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.