My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design - no permit on file
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
507 Ferndale Road North - 36-118-23-13-0007
>
Septic
>
septic design - no permit on file
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:01:19 PM
Creation date
8/16/2016 11:43:20 AM
Metadata
Fields
Template:
x Address Old
House Number
507
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
507 Ferndale Road North
Document Type
Septic
PIN
3611823130007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> SITE EVALUATION REPORT <br /> For Dr. Hamad Sajjadi ' <br /> Sewage Treatment System <br /> GENERAL INFORMATION <br /> This design is for a Type 1, 4 bedroom home and in accordance with the Minnesota Pollution <br /> Control Agency.Standards and local ordinances. <br /> A seasonally high water table was evidenced at 29 inches of depth in Soil Borings 1, 2 & 3. The <br /> slope is about 8%. <br /> The soils at a depth of 12 in Test Holes 1, 2 and 3 have a percolation rate of 10 minutes per <br /> inch. All neighboring wells are located more than 100' away from the proposed treatment area. <br /> NOTES: <br /> Keep all heavy equipment off the proposed treatment area before and after construction <br /> as much as possible. The treatment area should be marked off before construction. <br /> With proper installation and maintenance this system should have no problem in treating <br /> septic effluent effectively. <br /> It is recommended that the septic tanks be pumped every 2 years. <br /> MOUND SYSTEM: <br /> Flow: 4 bedroom = 150 gallon/day/bedroom 150 x 4 = 600 gallons per day. <br /> 600 GPD x 0.83 = 500 square feet. <br /> 10—foot wide rock bed 50 feet long = 500 square feet <br /> CONSTRUCTION EQUIPNIENT: <br /> A rubber—tired tractor may be used for plowing or disking to prepare the soil surface but in no <br /> case shall a rubber—tired tractor be used after the surface preparation is completed. A crawler <br /> or tract—t}�pe tractor shall be used for mound construction. <br /> SOIL SURFACE PREPARATION: <br /> The discharge pipe from the pump to the mound area shall be installed prior to soil surface <br /> preparation. The trench escavated to install the discharge pipe shall be carefully backfilled and <br /> compacted to prevent seepage of effluent. <br /> PAGE 2 � � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.