Laserfiche WebLink
_ " .�E'\l.�^;'� 5. <br /> T ', <br /> �Q i' " '' CITY OF ORONO <br /> �' '�' . `_ ,..� : ���, <br /> -�'`` SEPTIC SYSTEM APPROVAL <br /> � O �r�� <br /> � � :r�' <br /> ` � � c�TY of oRo�o <br /> ��� ,-',� R N�; �`v n <br /> ��� � � � �� „� <br /> � a�+` Y <br /> f�� �\ �y .a'a � �� �,i•_ <br /> � � �rr E , �.t> „. Municipal Offices <br /> ����c' �h`��' ,� ��` ' Post Office 13ox 66 <br /> � � � Qr'4��:.� � <br /> � � "1��;�(!'�'1��„ () Crystal Bay,i�tinnesota 553Z3-0066 <br /> �kIESK��� <br /> LOCATION: 50 7 Ferndale Rd. N. <br /> OWNER: Hamad Sa� i adi <br /> GENER.AL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Otto & Associates REPORT DATE: July 29, 1993 <br /> The City of Orono has Approved your on-site system design as of Auaust 2, 19 9 3 <br /> (approved-disapproved) (date) <br /> with dle following comments: The site plan does not indicate a property line <br /> setback for themound site, however, the City will allow the system up to <br /> 5 ' from the South lot line. Variances will also be granted for a 10 ' <br /> setback from the house and for the mound location on slopes greater than 6i . <br /> (system on 8i slope) <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> Iv'OTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, ete.) is allowed within 20' � <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORONO <br /> By <br /> Stephen c an, On-site ystems Manager <br /> TELEPHONE—473-7357• FAX-473-0510 <br />