My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-2011 Council Minutes
Orono
>
City Council
>
Minutes
>
2010-2019
>
2011
>
07-25-2011 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2012 4:18:39 PM
Creation date
7/26/2012 3:58:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
y' MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, July 25, 2011 <br />7:00 o'clock p.m. <br />• <br />(7. #11 -3510 CASEYHANKINSON ONBEHALF OF RYAN COMPANIES US, INC., 2725 <br />WAYZATA BOULEVARD WEST, Continued) <br />Hankinson commented that fortunately no one was injured in the roof collapse but the building is old and <br />is in rough shape on the inside. To repair the building is expensive, and given the lack of tenants, it did <br />not make economic sense for Ryan Companies to make the improvements. Hankinson noted they are <br />close to an agreement with a user to purchase Building 2. <br />Bremer stated with the applicant's concession to relocate the fence to match up with the building setback, <br />she would be fine with the application. <br />Hankinson stated one item he would like to request is that when they attempt to sign leases for this <br />building, they would like a definite timeline for when the conditional use permit would end. Hankinson <br />noted there was a discussion regarding the conditional use permit sunsetting once Industrial Boulevard is <br />constructed and requested the conditional use permit be good for ten years. <br />Mattick noted there would not be a time limit placed on the conditional use permit. <br />Curtis indicated that a possible sunset of the conditional use permit was initially discussed at the Planning <br />Commission meeting and that Staff s recommendation was to impose certain conditions instead and not <br />include a sunset provision. <br />Rahn stated that was to his point of getting the location of the fence squared away now. <br />• Rahn moved, Franchot seconded, to direct Staff to draft a resolution granting a conditional use <br />permit for Ryan Companies US, Inc., 2725 Wayzata Boulevard West, with the stipulations that <br />Ryan Companies comply with Staff s requirements for screening once Industrial Boulevard is <br />constructed and that the fence will meet the 35 -foot building setback. <br />McMillan requested that the green mesh along Old Crystal Bay Road be installed now. <br />Hankinson stated the green mesh will be installed at the time the fence is constructed and that the <br />vegetative screening will be added at the time Industrial Boulevard is constructed. <br />VOTE: Ayes 5, Nays 0. <br />CITY ENGINEER'S REPORT <br />8. NAVARRE SIDEWALK SEGMENT TO DAKOTA RAIL TRAIL <br />Kellogg noted in 2002 the City went through a process to design a pedestrian connection between Navarre <br />Park and downtown Navarre to what was at the time the future Dakota Trail. In anticipation of the <br />railroad becoming a trail, the City proactively designed two sidewalk segments. One section was between <br />Lyric and Livingston Avenue and the second section was between Livingston and Crystal Bay. <br />The sidewalk between Lyric Avenue and Livingston was constructed in 2003. The segment between <br />• Livingston and Crystal Bay was not constructed due primarily to the impacts to properties and conflicts <br />with existing utilities. There is a sanitary sewer and water main in the county right -of -way. There is also <br />Page 5 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.