My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2011 Council Minutes
Orono
>
City Council
>
2011
>
02-14-2011 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2012 4:16:08 PM
Creation date
7/26/2012 3:43:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL <br />Monday, February 14, 2011 <br />• 7:00 o'clock p.m. <br />(18. BIG ISLAND —REMOVAL OF STRUCTURES, Continued) <br />McMillan stated at a minimum the City needs to remove the burned debris but that she would like to look <br />at the possibility of leaving the utilities in place. <br />Gaffron indicated Staff will coordinate with Gabriel Jabbour on removal of the debris and existing <br />buildings. The City will also need to issue permits as part of that demolition process. <br />Printup asked what is entailed in maintaining the well. <br />Gaffron stated there will need to be some small enclosure to house the wiring and pipe. Gaffron noted <br />that enclosure would also have the potential to be vandalized. <br />Printup asked whether there is anything that would be salvageable from the structures. <br />Gaffron stated they will need to look into that, but to his understanding very little would be salvageable. <br />Printup stated he would like to see something in writing from the other two contractors refusing to submit <br />a bid. <br />Mattick noted the City does not need to go through a bidding process since the work is under $100,000 <br />and that perhaps the two contractors who declined to submit a formal bid would be willing to provide a <br />quote. <br />Franchot moved, Bremer seconded, to authorize the removal of the remaining buildings and debris <br />as noted by staff, and to obtain two additional quotes on the costs for the removal, with the cost of <br />the project not to exceed the estimate received from TEN Enterprises ($28,500) plus tax. <br />McMillan stated if Staff finds out the well will need to be capped prior to the buildings being removed, to <br />please notify the Council. <br />Gaffron indicated they will investigate that issue first. <br />VOTE: Ayes 4, Nays 0: <br />CITY ATTORNEY'S REPORT <br />None <br />*19. LICENSES AND PERMITS <br />RESIDENTIAL KENNEL LICENSES <br />1. Georgette Jabbour <br />is 4455 Bayside Road <br />Page 17 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.