Laserfiche WebLink
• , .��r:7 O,%�l,J�'�',(% <br /> � U''Fl.I�'.��.�c 1 E-20 <br /> MOUND DESIGN PROCEDURE (Continued) <br /> (For Flows up to 1200 gpd) <br /> G.3. Calculate basal width ratio H.2.f, riultiply dike multiplier by <br /> by dividing rock layer downslope mound height to get <br /> loading rate of 1.20 gpd/ft2 downslope dike width; / <br /> by allowable soil loading ,3. �p x.�? 6 = /� 2 f t `� <br /> rate; 2 / g. Compare the values of step H.l <br /> 1. 20 gpdi f t� -0, ,Sgpui i t = 2. �OJ and step H.2,f. Select the <br /> Check this value on page E-16, greater of the two values as <br /> 4. Multiply b�sal width ratio by the downslope dike width; / <br /> rock layer width to get /� � feet `� <br /> Y <br /> req�iired basal width; h. Calculate upslope dike width <br /> .�. �d0 x /O f t =Zi/•D f t � using upslope mound height <br /> and upslope dike multiplier <br /> H. Downslope Dike Width fro,�-n��pa�e E-18; <br /> 1. If landslo e is 3% or more, �. -�r x .-�•U = �f t <br /> P i. Total mound widtti is the sum <br /> subtract rock layer width of upslope dike width plus rock <br /> from basal width to obtain layer width plus downslope dike <br /> minimum downslope dike toe wid,th width• / I' ,-�Q <br /> �.�j f t - �_f t =/5! Of t ✓ ;�7`. 6f t�+ /O f t +� .�f t =.3'/,4'f t J � S,��r <br /> 2. Calculate mound hei ht at ed e � ` <br /> g � 3. If landslope is 2.9 percent or �1� <br /> of rock layer on downslope side; less, basal width includes both <br /> a. Determine depth of clean sand the upslope and downslope dike <br /> fi11 at upslope edge of rock / widths. <br /> layer: /, O feet `� <br /> b. rfultiply rock layer width by a. Calculate downslope dike width <br /> landslope to determine drop using steps H.2.a. throup,h <br /> in elevation; ` H.2.f; feet - <br /> � x �% : 100 = Q, t�f t � b. Calculate upslope dike width <br /> c. Add drop in elevation to depth using upslope mound height and <br /> of clean sand at upslope ed�e dike multiplier from Pa�e E-18; <br /> of rock layer to get depth of a ft = ft <br /> clean sand at downslope edge � c. Add downslope dike width to <br /> of rock layer. � upslope dike width to rock <br /> Q� �ft + /. lJft = /r, �� ft layer width to get total P,101111C� <br /> d. Add depth of clean sand at down- width; <br /> slope edge to deptti of rock _f t + _ _f t + _f t = f t <br /> layer to depth of soil backfill <br /> to get mound height at downslope d. Compare total mound width to <br /> ed�e of rock layer; / required basal width from step <br /> � �ft +,7Sft +/.ZSft =�. li ft � G.4 . If total mound widtli is <br /> greater than required basal <br /> e. Enter table on page E-18 with width, use calculated dike <br /> landslope and downslope dike `! widths. If required basal <br /> ratio. Select dike multiplier J width is p,reater than total <br /> of -3. 66 3;/ S"ea/>�' mound width, increase downslope <br /> dike width. <br />