Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, October 11, 2010 <br />. 7:00 o'clock p.m. <br />6. #10 -3471 TERRY SCHNEIDER WITH KLINGELHUTZ DEVELOPMENT ON BEHALF <br />OF WOODHILL SENIOR COTTAGES OF NAVARRE, 2525 SHADYWOOD ROAD — <br />CONDITIONAL USE PERMIT /SITE PLAN WITH PLAT AND EASEMENT VACATION <br />Curtis stated the applicant is requesting a conditional use permit and site plan approval for a 24- resident <br />memory care facility. The applicant also requests approval of a plat to consolidate the three existing lots <br />that comprise the site into one lot and the vacation of the drainage and utility easements associated with <br />the old plat. <br />At the August 9`" meeting, the Council reviewed the revised request and heard comments from the <br />neighbors. The applicant was directed to revise the civil plans in accordance with the Planning <br />Commission and City Engineer's direction. Additionally, the applicant was encouraged to work with <br />adjacent property owners in revising the landscape plan to achieve a level of screening satisfactory to all <br />parties. The applicant met with the neighbors on September 2nd and a revised landscape plan has been <br />drafted. <br />The Planning Commission voted 5 to 0 to recommend approval of the conditional use permit and site plan <br />for the first building of a possible two building assisted living facility subject to the following conditions: <br />1. Any additional lighting on the site to be dark sky compliant and not create glare, with the zero <br />light level at the property line being maintained; <br />• 2. The owner providing an escrow and signing an escrow agreement to ensure that erosion and <br />sediment control measures are properly maintained; <br />The owner providing the financial securities required by code to ensure that all non - building <br />improvements are properly installed, including sewer and water lines and service. <br />The Planning Commission also recommended approval of the preliminary plat and vacation of the <br />easements in the existing plat, with the condition that all required drainage and utility and drainage <br />easements will be provided for on the new plat. <br />The City Engineer is continuing to work with the applicant's engineer to resolve some storm water issues. <br />Upon resolution of the engineering issues, Staff recommends approval of the conditional use permit, site <br />plan, and plat. <br />Terry Schneider stated the main changes to their plan were to eliminate phase two from the plans and to <br />reduce the footprint of the rooms to avoid the need for a variance. They have had a number of back and <br />forth discussions regarding the ponding. A biofiltration basin will be utilized on the property. Bonestroo <br />has verbally agreed that a biofiltration basin is acceptable and that they are willing to comply with the <br />recommendations of the City Engineer. <br />Schneider noted another key issue with the application has been the landscaping. They have met with the <br />neighbors on this issue and discussed a number of different options. The basic changes to the landscape <br />plan are to include a solid row of arborvitae along the southern edge of the property and to also add some <br />. supplemental trees in that area to offset that dense hedging. Schneider indicated he did speak with the <br />neighbors and they are comfortable with the landscaping changes. <br />Page 9 of 20 <br />