My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Preliminary Septic Design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Preliminary Septic Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
8/9/2016 3:29:09 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2011 purplecode Mound Design <br /> www Sept�cResource com ivers 15.2j <br /> Property Owner: West Bay Homes Date: 6r27/2016 <br /> Site Address: 100 Bayside Trait PID: 0611723220026 <br /> Comments: <br /> instructions: � = enter data � = adjust if desired � = computer catculated - DO NOT CHANGE! <br /> �3 bedroom Type � Residential System <br /> _ 450 GPD design flow <br /> Yes Garbage disposal or pumped to septic 50% targer tank with multipte comp�tanks <br /> � 1500 Gal Septic tank �code minimum� 2000 Gal Septic tank (design size % LUG re�'d� <br /> Tank options: none <br /> 1•2 GPD/ft� mound sand loading rate contour toading rate of 12 req's a min 38 ft. long rockbed <br /> ��� 10.0 ft rockbed width 38.0 ft rockbed length <br /> � 3.0 ft laterat spacing 3.0 ft perforation spacing imaximum of 3 for both) <br /> end feed manifold connection <br /> � �3 taterals 36.0 feet tong 13.0 perfs / laterat 39 perfs total <br /> �1/2 a perf means the first perf starts at the middle feed manifold) <br /> t/4" inch perfs at �feet residual head gives 0.74 gpm f(ow rate per perforation <br /> for this perf size Ec spacing, �t pipe size on line ?2, max perfs/lateral = 25 . iine z8 must be iess --> <br /> i�,; 4.0 doses per day { 4 minimumi <br /> i i, 113 gatlons per dose {treatment volume► <br /> 2.00 5x <br /> �, 2.00 inch diameter laterals must be used to meet "4x pipe votume" requirement <br /> 2.00 3x <br /> 120 feet of 2.0 inch supply line leads to 20 gatlons of drainback volume <br /> ITip: "top feed" manifold to control the drainback� <br /> 133 galtons TOTAL pump out volume �treatment � drainbackj <br /> i� 8 feet verLical lift from pump to mound laterals, teads to a: <br /> i��. 29 GPM � 17 feet of head, Pump requirement �note: y50gpm may require an extra 3-6'of head) <br /> i, 500 gal Dose tank tcode minimum) 1000 gal Dose tank (design size ! LUG req'd) at 25.00 gpi <br /> leads to a <br /> i.� 5.3 inch swing on Demand itoat, or timed dosing of 4.6 min ON �confirm pump rate with drawdown <br /> (this delivers Average flow, =70%of Peak design flow►�hrs QFF test and adjust as necessary) <br /> ��� 12 inches from bottom of tank to "'Pump OFF"ftoat <br /> ,� 17 inches from bottom of tank to "Pump ON"float, or 12 inches to "Timer ON" float if time dosed <br /> _� 20 inches from bottom of tank to "Hi Level" ftoat, or 30 inches to"'Hi Level" float if time dosed <br /> __ 500 �allons reserve capacity iafter Hi;h Levet Alarm is activated� <br />
The URL can be used to link to this page
Your browser does not support the video tag.