My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3099 Farview Lane - 04-117-23-33-0003
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:12:16 PM
Creation date
8/8/2016 2:37:48 PM
Metadata
Fields
Template:
x Address Old
House Number
3099
Street Name
Farview
Street Type
Lane
Address
3099 Farview La
Document Type
Septic
PIN
0411723330003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� O� <br /> 0�:.,, O <br /> ��-� ��-� CITY of ORONO <br /> ����'r�� � �, <br /> � � r���� <br /> � � <br /> ,� ���h.��'����.,'� '�ti MuniciPal Offices <br /> � '�'•=�"���=,-�k�'�G Street Address: <br /> MailinQ Address: <br /> �E8�3�4 2150 Kelley Parlcway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> Owner:_� t�. ��ot��tiJe�q Address: 30`�5 ���v;ew � n <br /> City Ordinance 199 requires that each eXisting on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment s}-stem at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORNffTY (1-3): � <br /> 1 '�CODE SYSTEM�� An ISTS which meets ail the localion,design and coastruction standards ofthe current Orono Murucipal Code. <br /> �Z °COMPLIANT SYSTELf" An ISTS which does not meet all the location,design and rnnstruction standard5 ofthe cucrent Orono Municipal <br /> Code but does meet the threz foot separation requiremerrt,and which is not Failing or an immineirt threal to public health or safety. <br /> 3 ��NON-COIvIPLIANT SYSTEI�f" A prohibited LSTS;an ISTS located within a dmgnated 100-year flood plain,any ISTS which may <br /> or may not meet all the location,desig�or construction standards of the curterrt ptono\Innicipal Code and which is failing for any reason;and <br /> any ISTS with Izss than three fezt of untaturated soil or sand between the disttibution de�ice and the limiting soil characteristics. <br /> TANK CONDITION(�-101: 5 <br /> Tank inspection indicates: <br /> � Pumpout not needed at this timz. <br /> 6 Tank must be pumped out this}tar (city code requires tanks to be pumpzd out zvery 3 yzais. Tank was last pumped �_� � l ), <br /> 7 Solids accumulation in tanks is at a cricicai a critical level. Tanks should be pumped out�s soon as possiblz. <br /> 8 System is dischazging to tha surface. Tanks must be pumped out within 48 hours to elimir�surface discharge. <br /> 9 Inspection risars missing-tanks could not be inspected Inspection risers(4"dia.pipt)must bz instailed in each tank at ne.Yt pumpout If tanks <br /> have not bean pumped out within thz last three years,they should be pumped out now. <br /> 1� Inspeclion pipe is located duectly ovzr tank ba@le(does not giva accurate me3suremrnt ofsolids accumulation). If tanks have not been pumped <br /> out within tha l�st three years,they should bt pumped out now. <br /> DRAINFIELD CONDITION(11-14): \\ <br /> � Drainfield is dry,no surfacing evident <br /> 12 Soma evidence of surfacing,not crilical yet <br /> 13 Drainfiald is saturated and visibly dischargng unVeated effluent to tha surface. Contact the City Inspector immediately.Repaus must be <br /> completed within 90 days. <br /> 1� Draintield estent and condition unknown. <br /> C0��1�NTS: 5�15� � \oekS o{� . p� �a � r,c�J <br /> 5����.�.—,—�, _ t-n ���, �,�� v�leSS <br /> ����°� �� . <br /> Date of Inspection Scptic System Inspector �F <br /> Piota: In tha event that this iaspection report is uszd to safisfy the requuements for a mortgage or otha tr�far of property,be advised that this report dces not guuantee <br /> or certify that an esisting system will continue to function properly,but is merely an opinion of the adequacy of the systzm tuider currerrt conditions based on the available <br /> infarmatioa <br />
The URL can be used to link to this page
Your browser does not support the video tag.