Laserfiche WebLink
- _ ---.. <br /> � �� <br /> � O •. <br /> �� ''�''� C ITY of OROI�TO� <br /> �� � <br /> , �, i' <br /> '', � ,'�� � ��C, %i� Municipal Offices <br /> Street Address: Mailing Address: <br /> �L`q �'�G 2750 Kelle Parkway P.O. Boz 66 <br /> kESK� y <br /> - _,._ Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Cui7ent Owner of Address �� `'j � �"� l��� C't.�s' <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Mana�er at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identif d as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought ' to compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other � <br /> Septic Tank(s) Pump out Needed <br /> Yes ��TO <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> ( 2� I-(>� . The tank(s) should be cleaned through the manhole and <br /> not throu�h the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> �, � <br /> Ins ector: ������ �' � ��'` , ate of Inspection �' -� � <br /> r <br /> Telephone (9�2) 249-4600 � Fa� (9�2) 249-4616 <br /> w«w.ci.orono.mn.us <br />