My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-P12023 - air conditioning
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3090 Farview Lane - 04-117-23-34-0011
>
Permits/Inspections
>
2008-P12023 - air conditioning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:13:08 PM
Creation date
8/8/2016 2:24:34 PM
Metadata
Fields
Template:
x Address Old
House Number
3090
Street Name
Farview
Street Type
Lane
Address
3090 Farview La
Document Type
Permits/Inspections
PIN
0411723340011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ <br /> � FOR CITY USE ONLY <br /> , ,,¢�� City of Orono <br /> P.O Box 66 Date Received: Permit# <br /> ����� ���'�,� 2750 Kelley Parkway <br /> a i�''*• .�� Crystal Bay,MN 55323 Approved By: Amount$: <br /> ���e '��,'. ,,o`��" (952)249-4600 <br /> �;sxo��%' <br /> CITY OF ORONO—MECHANICAL PERMIT <br /> (All Commeroial permits must be approved by the[3uilding Official or[nspector and/or Fire Marshall) <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will <br /> be reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT <br /> VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE <br /> PERMIT CARD IS POSTED ON THE JOB SITE. <br /> 3. Mechanical Desi�ns—Complete calculations,details and specifications are required for each <br /> heating,ventilation,humidification-dehumidification,and air conditioning installation including <br /> heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to <br /> type,manufacturer and modeL Data shall be presented on form provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be <br /> obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call(952)249-4600. <br /> (24-48 hour notice required) <br /> 7. House Heating Test Record must be submitted before final. <br /> TYPE OF PERMIT <br /> Check All That A l <br /> ❑ Residential ❑Commercial(Approval Required) <br /> ❑ New ❑ Additional ❑ Repairs � Replace <br /> Job Site/Owner Information: <br /> Slte f�C�C�CeSS: 3090 Farview Lane <br /> OWIIeC: Sarah Schmidt Mailing Address: <br /> Clty: Orono ��p: 55356 <br /> Home Phone: Alternate Phone: <br /> Contractor Information: <br /> Contractor: Kleve Heacing&AC Contact Person: Ashley Griffin <br /> 6365 Carlson Drive,Suite G <br /> Address: State Bond #: <br /> City: Eden Pra�r�e Z�p: ss346 Expiration Date: <br /> PhOne: (952)941-4211 <br /> Alternate Phone: <br /> ❑ Insurance—Current: <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.