Laserfiche WebLink
w . <br /> �, � ' <br /> �---_-� 4 <br /> �`, �, <br /> �� O� A �� �� CITY OF ORONO <br /> O �'�;��� : 5EPTIC SYSTEM APPROVAL <br /> O K <br /> �a y .�. �e`�� � CITY of ORONO <br /> ,� ''''�'� � <br /> �i�� l'�. y��� �� C MUIIICI���CCS <br /> � �tl� �t�ti��`JJ ��� �,� POSt OfI1CC BOX GG <br /> �� `��� ,�,;.�'��,\i�,r+f-�``� Crystal Bay,Minnesota 55323-0066 <br /> �kEsH�g'/ <br /> _ = <br /> LOCATION: 3083 Farview Ln. <br /> OWNER: Phi 1 Byers <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S-P Testinq REPORT DATE: Auaust l , 1993 <br /> The City of Orono has Approved your on-site system design as of Augus t 20, 19 9 3 <br /> (approved-disapproved) (date) <br /> with the following comments: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORONO <br /> By <br /> Stephen eckman, On-site Systems Manager <br /> T'ELEPHO[YE-473-7357� FAX-473-0510 <br />