My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-27-2006 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2000-2009
>
2006
>
11-27-2006 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 4:40:29 PM
Creation date
7/25/2012 4:40:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, November 27, 2006 <br />7:00 o'clock p.m. <br />ROLL CALL <br />The Council met on the above - mentioned date with the following members present: Acting Mayor Jim <br />White, Council Members Bob Sansevere, Jim Murphy, and Lili McMillan. Representing Staff were City <br />Administrator Ron Moorse, Planning Director Mike Gaffron, City Attorney Matt Brold, City Engineer <br />Tom Kellogg, and Recorder Jackie Young. <br />Acting Mayor White called the meeting to order at', 7:00 p.m., followed by the Pledge of Allegiance. <br />CONSENT AGENDA <br />Item No. 9 was added to the Consent Agenda and <br />Murphy moved, Sansevere seconded, to <br />VOTE: Ayes 4, Nays 0. <br />APPROVAL OF MINUTES <br />*2. REGULAR COUNCIL MEETING OF <br />No. 10 was deleted. <br />the Consent Agenda as amended. <br />VEMBER 13, 2006 <br />Murphy moved, Sansevere seconded, to approve the minutes of the November 13, 2006 City <br />• Council meeting as submitted. VOTE: Ayes 4, Nays 0. <br />PUBLIC HEARING — 7:00 P.M. <br />3. FARVIEW NEIGHBORHOOD SANITARY SEWER PROJECT <br />a. ORDER PREPARATION OF PLANS AND SPECIFICATIONS — RESOLUTION <br />NO. 5534 <br />White opened the public hearing at 7:06 p.m. <br />Moorse explained the public hearing relates to the 1~arview neighborhood sanitary sewer project. A <br />feasibility study has been completed and a meeting with the neighborhood was held. The City received a <br />_ - petition where the vast majority of the residents in the area have indicated support of the project. If <br />positive public comments are received tonight at the public hearing, it would be Staff s recommendation <br />that the Council approve preparation of the plans and specifications for bid. <br />Kellogg stated the one item that should be determined if the City elects to approve preparation of the <br />plans and specifications is the number of properties,that would be included in this project. Kellogg <br />illustrated the service area on the overhead, noting that two additional properties on Fox Street have <br />indicated an interest in being included in this project. The estimated cost per unit is approximately $8500, <br />although the cost may decrease slightly if the two additional properties are included. <br />Jerry Kemp, 2800 Farview Lane, stated with respect to the cost, the original feasibility report indicated <br />the sewer would run up to Fox Street along Farview. To access the one property to the northwest, the <br />sewer line would need to be extended, which would raise the cost slightly, but with the addition of the <br />two properties, the cost would probably remain the same. <br />PAGE 1 of 10 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.