Laserfiche WebLink
� <br /> ,.�C� <br /> a ` � �� <br /> CITy OF ORONO SEPTICSYSTEI�IPER��-IITAPY'LICATTON <br /> Box 66 (2750 Kelley Parkway) - <br /> Crystal Bay, I1�N ��323 = <br /> JOB SITE ADDRESS: -30 7S �C�� �.)��� �—d-�`E" <br /> Occupanc�� Type: Residential � Commercial Other <br /> Permit T`•pe: iV'etiv or Replacement S}'stem, � 50.00 � ' <br /> Repair Existina System, � <br /> (Tanks or Drainfield) <br /> 0.50 State surcharae added to above fees � <br /> *See fee schedule for non-residential permit fees <br /> O�vner's I�'ame: (�"lc�,�L����-/ l� � n v� PhoneNumber: <br /> I�Iailing Address: � � v`ew -��i�% City: c�izv,��c� 7ip: S_ 5� <br /> Contractor's I�Tame: a � PhoneNumber: �-1 �� (.70Z _ <br /> Cit ��3y� <br /> I�Iailing Address: ��zvs� C,�h;t���� .�i`' y: }��r��v�e �P_— <br /> DO \TOT 1�IAIL PAYi�"IENT ti�ITH THIS APPLICATIO�' <br /> GEtirERA-L -�STRUCTIO\TS <br /> �. Applicacions for sep[ic system permits may be mailed or submitted in person at the Ciry <br /> Offices; ho�vever, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. � <br /> 2. perrnits will be issued only to concractors holdin� a City oi Orono Septic System <br /> Installers License. <br /> 3, AIl work must be done in accordance �vith the approved septic system desi�n. Desi�n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The follow•in� inspections will be required for all sepcic systems: _ . <br /> A. Pre-installation site inspection to include inspector, instalier, and general concractor. <br /> B. Tank installation prior to coverinJ. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspeetion is requued <br /> afrer rouah-up buc prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain durin; pressure distribucion pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Iridividual holdin�MPCA Installer Certificate shall be present durinJ inspections: A 2`�" <br /> hour notice is required for all inspections. <br />