Laserfiche WebLink
• <br />• <br />MINUTES (OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 11, 2006 <br />7:00 o'clock p.m. <br />(4. #06 -3206 KEN ANDLORIJEAN <br />McMillan inquired whether the building inspector <br />Bremer commented the 15 feet was merely the rec <br />had not verified the need for an additional support <br />White moved, Murphy seconded, Application 30 <br />Lake Drive, to direct Staff to draft a resolution a <br />of the garage and granting of a side lot line setba <br />hardcover as proposed by the applicant, and req <br />inner part of the house. VOTE: Ayes 3, Nays 0. <br />5. #06 -3208 RYAN COMPANIES US, INC., <br />PRELL IINARY SUBDIVISION AND COMME <br />RESOLUTIONS NO. 5504 and 5505 <br />Genieve McJilton, Ryan Companies, was present. <br />4225 FOREST LAKE DRIVE, Continued) <br />d verify the cutoff for the deck. <br />ndation of the Planning Commission and they <br />at that location <br />206, Ken and LoriJean Anderson, 4224 Forest <br />roving the addition of a second story, expansion <br />variance, requiring a reduction in the <br />ing the deck being reduced to 18 feet from the <br />WAYZATA BOULEVARD WEST — <br />L SITE PLAN APPROVAL — <br />Turner stated this application was before the Council !on August 140', with the issue of drainage remaining <br />unresolved at that time. The applicant now understands that the drainage problem is runoff that flows <br />from the existing parking lot onto Morrie's Automotive property and that what the City is looking for is a <br />temporary diversion of the water to a spot on the applicant's property. <br />Murphy inquired whether devegetation of the existing swale would be sufficient. <br />Kellogg stated it was his understanding that Ryan w Iuld be submitting a plan and that he has not seen a <br />plan yet. . <br />McJilton stated it was their understanding the City Engineer was going to review the site and provide his <br />feedback. McJilton noted their engineer has reviewe� the situation and they feel there is a workable <br />solution. <br />Kellogg stated he did not realize the applicant <br />that it was his understanding he would be corn <br />. that his office would be designing a solution and <br />on the plan once one is submitted. <br />McJilton stated they are willing to work with the City on this issue but that she had the understanding the <br />City Engineer was reviewing the drainage on this site and the area in general. <br />Murphy stated a meeting is scheduled for Thursday <br />Engineer feels something needs to be done in that a <br />Mchlton stated they are in agreement with making s <br />that they are to submit a plan for review by the City <br />discuss the drainage in this area and that the City <br />to move the water. <br />temporary changes and that she understands now <br />Turner stated the striping plan has been revised and 'approved by Bonestroo and would include the <br />• addition of a four -foot bituminous shoulder on the west side of Old Crystal Bay Road and the striping of a <br />center turn lane. Staff would like it understood that the Ryan development access points determine the <br />access points for the west side of the road, and that if there is an access into the development that is <br />P <br />7 of 20 <br />