Laserfiche WebLink
i <br /> buyer information about the status and location of individual sewage treatment systems <br /> on the property or servicing the property. The disclosure must also include a map <br /> showing the location. The seller must indicate whether the system is in use and to the <br /> seller's knowledge in compliance with applicable sewage treatment laws and rules. If a <br /> Compliance Inspection would have been completed at the time of the sale, the system <br /> would have been classified as failed. <br /> This property has no area available to install a new Standard On-Site Sewage <br /> Treatment System under Minnesota Chapter 7080 rules due to fill soil, wetlands, tennis <br /> court. The proposal is to install an Other System under Minnesota Chapter rules <br /> 7080.0178 for a six bedroom home. A monitoring plan is required with a minimum of <br /> monitoring for hydraulic overloading & monitoring the daily water use. This will need to <br /> be determined by the City of Orono. A water meter will need to be installed. Soil <br /> borings found the original topsoil at 62", 68", 72" & 84" below grade. The fill soil will be <br /> removed (after excavation, the original soil must be checked by S-P Testing, & the City <br /> Inspector) and backfilled with washed sand to elev. 94.7 and install a 1500sq.ft. <br /> seepage bed. 5' to the south of the seepage bed, the soil must be excavated also to <br /> the original soil and backfilled with loam soil to finished grade. Recommend to use <br /> untreated plywood befinreen the sand & loam fill to prevent the two soils from mixing. <br /> The over excavation is needed to prevent effluent from following the original mound <br /> sand to the wetland to the south. Inspection pipes will be needed, one at the original <br /> soil and one at the bottom of the rockbed and sand fill layer. <br /> Approval will be needed for the seepage bed to be 35' from the wetland to the south. <br /> A Multi-Flo Wastewater Treatment System will be added due to this site having no <br /> additional area to treat septic effluent &to help assure long term survival of the system. <br /> The Multi-Flo Aerobic Wastewater Treatment System classified as standard under <br /> Minnesota Chapter 7080 rules. The highly treated, filtered effluent produced by the <br /> Multi-Flo is over 95% free of the normal sewage contaminants that cause the <br /> progressive failure of conventional systems. The unit will be a 1000 gal/day. A trash <br /> trap is installed in front of the Multi-Flo. The unit requires to be serviced 2 times a year <br /> which will be done by Schirmers Wastewater Treatment Systems, Inc. A 2 year service <br /> & parts warranty comes with the purchase of the unit. After that time, the homeowner is <br /> required to carry a Service Contract at $125.00 a year (2002 price). A report is sent to <br /> the homeowner, city, MPCA & Multi-Flo yearly. <br /> 2 <br />