Laserfiche WebLink
0 <br />• <br />1i <br />ORONO CITY C <br />Monday, <br />7:00 o' <br />( #06 -3208 Ryan Companies, Continued) <br />Turner stated she should receive an answer on that <br />Nordland commented he is confident that issue wi <br />with the recommendation that the water line shoul <br />property to complete the loop for the area but that <br />since it benefits a number of other sites. <br />Murphy inquired which properties would be <br />Kellogg stated the City undertook a water main p. <br />industrial park located on the south side of Highm <br />existing crossings that were aging and were in nei <br />a 12 -inch line to the south and to the east but that <br />building on this site. <br />Kellogg stated the intention was to abandon that <br />applicant to extend the water main westerly and <br />connect to the existing eight -inch water main. K <br />quality and to ensure adequate fire protection. <br />Nordland stated everyone that is located on the loc <br />supports the work but feels it is a City project. Ni <br />Old Crystal Bay Road and Highway 12 to complet <br />be a shared project with the other property owners <br />OF THE <br />INCIL MEETING <br />ust 14, 206 <br />ck p.m. <br />in a couple of days. <br />be resolved. Nordland stated they are in agreement <br />be continued under Old Crystal Bay Road and their <br />Ley feel the work off site should be a City project <br />by that work. <br />ect last year to provide adequate water supply to the <br />12. Kellogg stated there were two eight -inch <br />of replacement. Those crossings were replaced with <br />old crossing exists to the east of the existing <br />line at some point and that they are asking the <br />herly at the intersection of Old Crystal Bay Road to <br />gg stated the loop is required to improve water <br />would benefit from that work and that Ryan <br />dland stated the extension of the water main under <br />the loop would be off site improvements and should <br />McMillan inquired how many fire hydrants would be located on Highway 12. <br />Turner stated there would be multiple hydrants. <br />Nordland stated they would assume 100 percent <br />but that the costs for the other work should be be <br />ie costs for the work completed on their property <br />by the other properties or the City. <br />Kellogg inquired how the City handled the Stone Bay water main. Kellogg stated Stone Bay was <br />required to bring the water main easterly on Kelley Parkway and down to Highway 12. <br />Gaffron stated one sewer connection was between <br />recall the specifics of that project. Gaffron stated <br />responsible for making the crossings to Highway <br />the City has handled that situation in the past. <br />Nordland stated typically that burden to complete <br />ighway 12• and Kelley Parkway but that he does not <br />question is whether Ryan Companies should be <br />to complete the loop and that he is unaware of how <br />loop falls on the last property to be developed. <br />PAGE 15 <br />