Laserfiche WebLink
. MINUTES OF TAE <br />ORONO CITY COUNCIL MEETING <br />Monday, July 10, 2006 <br />7:00 o'clock p.m. <br />• <br />(RYAN COMPANIES, CONTINUED) <br />Murphy inquired what the plan is for the building housing the mailing business and the upholstery <br />business. <br />Nordland stated the mailing operation is no longer there and the upholstery shop's lease runs until spring, <br />2007. At the time ABC vacates its space in that building, renovation of the building would be completed. <br />Nordland stated the final building would be constructed in 2010, with the current access off of Wayzata <br />Boulevard being moved to straddle the property line and shared with the adjoining property. Nordland <br />stated it would be difficult to operate the building prior to the road being built if the access were restricted <br />immediately. <br />Murphy inquired whether the lease also includes the boat storage on the back portion of the lot. <br />McJilton stated she would need to check the lease. <br />Nordland indicated they would obtain that information prior to the next meeting. <br />Murphy stated they might not be able to do anything with the access until the highway project is <br />completed. <br />Nordland stated Ryan is requesting a sketch plan review and will be appearing before the Planning • <br />Commission in July and the City Council in August. Nordland stated the plan is consistent with Orono's <br />Comprehensive Plan and the newly adopted Industrial Ordinance. <br />Nordland stated a variance is being requested to allow for a 50 -foot right -of -way and a conditional use <br />permit for the building materials for the larger building in the back. Nordland indicated the conditional <br />use permit will fully comply with the requirements of the ordinance and would allow the Ryan <br />Companies to utilize the same features, textures and colors that are used in the front two buildings. <br />Nordland indicated the proposed materials are depicted on the boards. <br />Nordland stated the back building cannot economically support more brick and that the existing facility <br />will never be as nice as the newer buildings. <br />Sansevere inquired whether the existing building would harmonize with the rest of the buildings. <br />McJilton displayed the materials that would be used on the two smaller buildings and the scheme for <br />painting the existing building. <br />McMillan inquired whether more detail would be utilized on the south building located on Old Crystal <br />Bay Road. <br />Nordland stated they do have elevations of each building. <br />PAGE 20 <br />