Laserfiche WebLink
� <br /> � <br /> '� ,'�• DETERMINING PERMIT FEES 4: <br /> F' <br /> � SAC Charge(2007 Rate=$1,675.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connectioo permit will not be issued) <br /> � Sewer Connection/Disconnect/Repair($35.00/Per Stub) $ 35•� <br /> Pipe size l�inches;material$���1 Schd 40 air tested; 0 cast iron <br /> ❑Water Connection/Disconnect/Repair($35.00/Per Stub� $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> 1. SUBTOTAL of Permit Requested: $ 35•OC� <br /> 2. STATE SURCHARGE $ .50 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 1.50 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ 35•S� <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a senarate permit. <br /> • WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are,true and correct. <br /> Applicant: 1�- /L , c���y. Date: ���71�7 <br /> Reset Form <br />