Laserfiche WebLink
• <br />• <br />MINUTES <br />ORONO CITY COI <br />Monday, Octc <br />7:00 o'cic <br />(Public Comments, Continued) <br />F THE <br />CIL MEETING <br />r 10, 2005 <br />p.m. <br />LaFavre stated the gates have been custom made and that they have pictures of approximately 20 <br />residences that have gates in Orono. LaFavre stated he would like the gates for protection, and inquired <br />what he needs to do in order to comply with the City's regulations. <br />Gaffron stated this issue probably would not be resolved until January or February. <br />Sansevere stated the safety factor was probably the <br />gate height to six feet. <br />Peterson stated a public hearing would be scheduled <br />regarding the height of gates, but that the City is not <br />Gaffron stated the earliest a variance application <br />ordinance has been formally adopted. <br />LaFavre inquired whether the other gate could be <br />would like to have the gates installed for safety re <br />Sansevere suggested the property owner speak with <br />be reduced down to six feet. <br />Peterson inquired whether the other gate could be <br />fact. <br />factor for increasing the maximum allowed <br />the Planning Commission in November <br />:ing the gates be removed at this time. <br />d be made would be the end of January after the <br />it <br />and made operational. LaFavre indicated they <br />manufacturer of the gate to see if the gate could <br />and whether it would be considered after -the- <br />Gaffron stated it sounds like there are two entrances with two sets of gates, which Staff was not aware of, <br />but would reference the submitted plans. i <br />LaFavre stated there are two driveways into the <br />second gate is a little over seven feet tall. <br />Sansevere inquired whether the gate would be seven <br />LaFavre's contractor stated the panels of the gate are <br />Sansevere suggested in the-future the contractor <br />starting any work in Orono. <br />Peterson stated Staff was not aware that there were <br />LaFavre's contractor indicated he did submit plans <br />Peterson recommended the contractor contact Staff <br />, but indicated the other gate is smaller and the <br />high from ground level. <br />feet tall. <br />the City regarding height restrictions prior to <br />separate entrances with two separate gates. <br />PAGE 7 <br />the two entrances and the two gates. <br />to try to resolve some of the issues. <br />