My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-2005 Council Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
2000-2009
>
2005
>
07-11-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:50:57 PM
Creation date
7/24/2012 4:54:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />i <br />• Monday, July 11, 2005 <br />7:00 o'clock p.m. <br />(Public Comments, Continued) <br />Miller stated the problem now lies with the cleanup of the sand on his property. Miller stated he would <br />like a definite date for when the work would be completed. <br />Moorse stated it was his understanding that when the issue first arose the City of Long Lake did address <br />the situation. <br />Miller stated the City of Long Lake did clean it up one time but that the silt fence has fallen down twice. <br />Miller indicated he had to file litigation in order to get Long Lake to respond to this situation. <br />Murphy noted it has been approximately two years ,i ince the fire station project has been completed. <br />Murphy inquired whether Mr. Miller would like the silt fence to remain up or be removed. <br />Miller stated he was informed at the time of the firer station project that this area would be revegetated, <br />which has not been completed. Miller indicated this area tends to erode whenever it rains. <br />Moorse stated the silt fence that is currently in place by Willow needs to remain in place but the silt fence <br />located at the back of the fire station could possibly, be removed. Moorse stated if the City of Long Lake <br />• does not complete the work in the next few days, the City of Orono would go ahead and complete the <br />work. <br />Miller stated he also has contacted the City regarding some screening of a parking lot in close proximity <br />to a residential area, and requested that a fence be erected in accordance with the City's ordinances. <br />Miller indicated he also has some lighting concerns that he would like to discuss with the City in the near <br />future. <br />ZONING ADMINISTRATOR'S REPORT <br />3. #05 -3097 HASHEM ABUKHADRA, 1745 FOX STREET — PRELIMINARY PLAT <br />APPROVAL — RESOLUTION NO. 5346 <br />Hashem Abukhadra, Applicant, and Mark Gronberg, Gronberg & Associates, were present. <br />Gundlach noted this application was discussed at the June 26 City Council meeting. Gundlach stated the <br />issues discussed at that time included the guesthouse, whether lot six should be considered a back lot, <br />elimination of existing accesses onto Fox Street once construction of the new road is completed, septic <br />sites for proposed lot six, and the impacts of the Rural Oasis study. <br />•Gundlach stated a preliminary plat resolution has been drafted and is attached to the Council Members' <br />packets. Gundlach noted an amended page four of'the resolution has been distributed to the Council at <br />RkGE 3 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.