My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2005 Council Minutes
Orono
>
City Council
>
2005
>
06-13-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:50:41 PM
Creation date
7/24/2012 4:53:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, June 13, 2005 <br />7:00 o'clock p.m. • <br />(05 -3111 Water Street Homes, Continued) <br />Gaffron stated there are risks associated with granting a conditional use permit and that conditions can be <br />placed on the property to address any concerns the Council may have. Gaffron indicated a situation could <br />arise that the conditions do not address. <br />McMillan commented the enforcement of the conditional use permit would be another issue. <br />Murphy stated in his view it is a remarkable use of the property and that the applicants have taken great . <br />steps to design it to fit the land. Murphy inquired how this structure could be redesigned so it would not <br />fall under the wetland moratorium. <br />Gaffron inquired whether the building could be shifted without having other major impacts on the site. <br />Carlson inquired what setback they would need to meet. <br />Gaffron stated the moratorium requires a 26 -foot setback from the edge of the wetland. Gaffron indicated <br />the moratorium covers any wetland that has been identified under the federal wetland delineations and <br />that any structure that is located within that 26 -foot buffer would be affected by the moratorium. <br />Carlson stated the building would need to be redesigned if they are required to meet the 26 -foot buffer. <br />Carlson stated the hardship in this case deals with the intent of the ordinances and why they are drafted , <br />and that the ordinances do not address every situation. Carlson pointed out there is an outlot located in <br />the front and that the entire square footage of the property should be counted. Carlson stated the outlot is <br />owned by the property owners and there is no shared access over the outlot. Carlson stated if the entire <br />amount of land owned by the applicants is taken into account, a variance would not be required, and that <br />the strict interpretation of the ordinance creates a hardship. <br />Carlson stated they are able to meet the spirit and intent of the ordinance by constructing two separate <br />structures, each consisting of 1200 square feet, which would not be as aesthetically pleasing as what is <br />being proposed. Carlson stated they have attempted to create an aesthetically pleasing structure that <br />would add value to the lot, limit the visual impact to the neighbors and to the property owner, and also <br />meet the spirit and intent of the code. Carlson agreed they would need to address the issue with the <br />wetlands. <br />Barrett stated he is in agreement with staff that the moratorium does apply to this property and that no <br />portion of the structure can be constructed within that 26 -foot buffer while the moratorium is in effect. <br />Carlson inquired how long the moratorium is in effect. <br />Gaffron stated the moratorium expires in October but that the City would likely adopt stricter regulations <br />concerning wetlands once the moratorium is up. <br />Carlson stated they would be able to meet the 26 -foot buffer by reducing the amount of square footage of <br />the structure. Carlson requested that they be allowed to submit a revised drawing that meets the 26 -foot • <br />PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.