My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2005 Council Minutes
Orono
>
City Council
>
2005
>
02-14-2005 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:49:27 PM
Creation date
7/24/2012 4:46:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U <br />MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, February 14, 2005 <br />7:00 o',clock p.m. <br />( #05 -3080 Interspace West, Continued) <br />Sansevere reiterated that it does not fit in with the <br />Highway 12 corridor. <br />that the City has tried to achieve along the <br />Carlson indicated this project would not be highly Lible from Highway 12 and would be set back into <br />the natural surroundings. II. <br />Peterson also raised concerns with the European look being proposed for this site. <br />Carlson stated the proposed roof is similar to the roof on the city hall building and has stucco siding. <br />Carlson noted certain building materials must be utilized in Feng Shui. <br />Sansevere stated the Council would have to look at I Nether this project would blend in with the rest of <br />the community. <br />Carlson stated Feng Shui is an ancient Asian practice that has been proven over time <br />Sansevere stated in his view this concept could be <br />• White stated he also does not like the appearance, <br />the community. White stated he would like to get <br />Larson stated a storm sewer is proposed for the <br />existing storm sewer system that is part of the s <br />Carlson stated in her view it appears the council is <br />addressed with Staff. <br />into a more traditional looking building. <br />that there needs to be a better blend with the rest of <br />re information on the water flow for this site. <br />side of the units that would be diverted to the <br />housing project. <br />ing the roofline and the fagade, which can be <br />McMillan commented there are a lot of positives with this project, particularly the way the buildings have <br />been clustered and the concept of the office condo. McMillan stated she appreciates the thought and work <br />that has gone into this project but that she has a concern with the type of materials being proposed for this <br />project. <br />Carlson stated in her opinion the materials could be ' corked out. <br />Sansevere inquired what assurance the City has that this project will not remain vacant. <br />Carlson indicated the buildings would be built in <br />successful and hopefully completed within 24 me <br />McMillan inquired whether there is any additional <br />neighborhood would like to see. <br />• <br />and that in their experience this project will be <br />PAGE 15 <br />i <br />that the adjoining residential <br />
The URL can be used to link to this page
Your browser does not support the video tag.