My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
04-16-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 4:23:19 PM
Creation date
7/24/2012 4:15:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
540
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr.Mike Gaffron Re:Orono Villas <br /> - Page 4 13 November 2006 � <br /> • Plans should be submitted to the Fire Marshal for review and approval. <br /> Plans wi1/be submifted to the Fire Marshal for review and approval. � <br /> - � Easements <br /> • It appears that the proposed sidewalk to the east of the townhouse on Lot 2 . <br /> ' encroaches on the proposed drainage and utility easement. The sidewalk <br /> �. � shou(d be relocated outside of the proposed easement. <br /> � � The sidewalk for the townhouse on Lot 2 has been revised to be outside of the <br /> � �� . � proposed easemenf, see sheet C4.1. ' � <br /> � : .� � � • 10' drainage and utility easements should be provided along all exterior lot <br /> �� . lines. In, addition, drainage and utility easements should be provided along all <br /> � .• ponding areas, drainage ways, and wetlands. Specifically, an easement should <br /> , . � be provided over the existing wetland in the southeast corrter of the site, and � <br /> � � � � �extend west along the south property line to the�existing wefland. In addition, a <br /> :�� 20' drainage and utility easement should be provided over the proposed <br /> � � watermain along the north boundary of the site. . <br /> A 10'drainage and utility easement has been provided along all exferior lot lines. All <br /> ponding areas, drainage ways and wetlands have been provided drainage and ufility <br /> � easements.. A 20'drainage and utility easement has been provided t'or the proposed <br /> :_:: watermain. See sheets C4.� and C5.9 for all easements.; ,;. .. ; , : <br /> Genera! � � <br /> ' • The proposed improvements will disturb more than one acre. This will require a <br /> permit from the MPCA. Final plans should include a detailed Storm Water � � <br /> Pollution Prevention Plan (SWPPP) for review and approval. � � <br /> . � A detailed Storm WaterPollution Prevention Plan will be provided in the fina!plans � . <br /> for review and approval. � � � <br /> . a, The plans should include all applicable Orono City Standard Details. . . <br /> The �nal plans will include all applicable Orono City Standard Defails. � � <br /> � • AI� submitted plans (half size and full size) should be scaleable. <br /> � Okay � <br /> � � � .� • Once,the plans have been completed we wil( prepare an estimated cost for the <br /> � site improvements as a basis for the necessary financial guarantee. � <br /> 100 NORTH 51XTH STREET SUITE SOOC MINNEAPOLIS,MN 55403 • <br /> Ur=FIC_: 612.252,9G70 =AX: 012.252.9u77 www.landForm.reE � <br /> . . • , <br />
The URL can be used to link to this page
Your browser does not support the video tag.