My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
04-16-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 4:23:19 PM
Creation date
7/24/2012 4:15:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
540
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F) Each and every landscaped area with an underliner (whether the underliner <br /> is impervious or not), regardless of whetrher the area is covered with woodchips, <br /> stones, dirt or plants; � <br /> G) Any swimming pool.or wading pool; � , • . <br /> � � � H) Any tennis court covered�with concrete, asphalt or clay, but not any tennis � � � . <br /> court coyered with grass. • , <br /> 4. Lot Coverage. Per Ordinance 80, 2nd Series adopted February 26, 1990, the total .� <br /> combined footprint areas of all principal and accessory structures shall not exceed 15% . � <br /> of lot area. The following shall be included in calculation of lot coverage by structures: - � <br /> a) all roofed structures which extend more than 6' above grade level; � <br /> b) tennis courts, patios, decks and all similar open structures when partially or • <br /> fully enclosed by fences,railings or walls which extend more than 6' above <br /> . grade level(if any portion of such structure extends more than 6' above grade � <br /> level,the entire structure shall count towards lot coverage); <br /> c) pools,including pool basin and associated deck or patio areas, regardless of <br /> whether such pool basin, deck or patio is enclosed with a fence. , <br /> 5. All lots shall.be provided with a functional means or method of backing out. The Cify <br /> . will not approve the backing out of motorized vehicles onto Sugar�vood Drive. <br /> 6.' For all applicants who find they cannot meet the required standards for development <br /> within the Sugar Woods Planned Residential Development,please refer to Aftachment <br /> B for special directions. ' <br /> 7. Written confirmation from Rebers Construction that the building plans and site plan <br /> • � have been approved by the Architectural Revie�v Committee for Sugar Woods. ' <br /> At the time a Certificate of Occupancy is issued for a new dwelling within the subdivision <br /> of Sugar Woods,the City has agreed to execute and deliver to the owner of each lot a�artial release . � <br /> of�ub�ivi�er's agreement fc�r that lot. LT�on the recordation of such partial release of subdivider's <br /> agrzement,the Registrar of Titles is authorized and instructed to remove from the Certificate of Title . <br /> ' for the lot,the memorial of this instrument and the memorial of the partial release of subdivider's . ' . <br /> agreement. • � <br /> Please contact the Building and Zoning Department (473-7357) if you have any questions ' <br /> concernin�the directives listed above. � � . <br /> Yrior to anv site pre�araiion iree cuirting,land aIterations oi•coi�s��-u�ti�n,the Buildir.� <br /> Setback Area must be defined on the site with nlastic or�vooden snow fencinQ. This fencina <br /> must remain on the site until a•re�resentative of the Orono Buildin� Denartment nrovides <br /> written confirmation that fencing mav be removed. . <br /> . _ . . .-�. �� �... <br />
The URL can be used to link to this page
Your browser does not support the video tag.