My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2007 Planning Commission Packet
Orono
>
Planning Commission
>
2007
>
11-19-2007 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 4:28:14 PM
Creation date
7/23/2012 4:28:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , <br /> PC Exhibit H 'i <br /> Memorandum �Bonestroo <br /> To: Evelyn Turner Projecr. Stonegate Farm �ate: 1 1/1/2 O O 7 2335 Highway 36 W <br /> St.Paul,MN 55113 <br /> Ftom: lohn Smyth,CWD Client; City or Orono Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> Re: Wetland Ordinance Review Memo Flle No: 139-07000-1 www.bonestroo.cam <br /> Remarks: <br /> Per section 78-1601 of the Wetland Ordinante the project will require wetiand buffers and <br /> setbacks due this being considered a new development. <br /> Plan Sheet C-4.01 labels the wetland as Wetland A west of the access trai!and culvert and <br /> Wetland B east of the trail and cuivert. 7he applicant shall provide the Ciry a copy of the <br /> approval letter o�notice of decision for the wetiand delineation from the MCWD to verify the <br /> delineated wetland boundaries have been accepted. <br /> The wetland is ciassified as Manage 1 and requires a 35 foot buffer and 20 foot setback. <br /> Currently the plan shows a buffer and setback on the portion of the wetland adjatent to the <br /> homes as shown on the plat. The buffer and setback requirements are required to be around <br /> the entire perimeter of the wetland within the plat and this should be reflected on the next plan <br /> submittal. <br /> Buffer Condition and Requirements <br /> A site evaluation was completed on 1 November 2007 to determine the condition of the � <br /> vegetation in the existing upland buffer. The upland buffer of Wetland A is wooded, old field <br /> and turf grass. The upland buffer of Wetland B is o!d field and turf grass. The old field of <br /> Wetland A and B have invasive species that include reed canary grass and thistle. The old field <br /> and turf grass areas will require supplemental seeding and removal of the invasives to betome <br /> acceptable buffers. The wooded area will need to have the buckthorn removed as well as some <br /> seeding to become acceptable. <br /> The applitant will need to provide a Management/Landscaping plan that includes the fallowing: <br /> 1. Method proposed to be used to control buckthorn{MN DNR website source for <br /> options). All buckthorn removal should be done using hand tools as large equipment <br /> can further disrupt the wetland buffer. At a minimum buckthorn should be cut and <br /> the remaining stems should be treated with an approved herbicide following label <br /> instructions. Treating the cut stumps will help prevent regrowth of the buckthorn. <br /> 2. Method of establishing native vegetation in turf areas{MN BWSR Web Site— <br /> Publication: "Restoring&Managing Native Wetland and Upland Vegetation" source <br /> for options). <br />
The URL can be used to link to this page
Your browser does not support the video tag.